| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 CrAdmitted-Finance | ₹5.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹6.2 CrAdmitted-Finance | ₹6.2 Cr | L2 | Admitted-Finance |
| 3 | L3₹6.9 CrAdmitted-Finance | ₹6.9 Cr | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical technically disqualified |
| Sl No | Description | Qty | Unit | S K ELECTRICAL WORKS L1 | RELIABLE INDUSTRIAL SOLUTION L3 | RAMA INDUSTRIES L2 |
|---|---|---|---|---|---|---|
| 1.00 | 1.Design and build sewage treatment plant of installed capacity 1.00 MLD and all appurtenant structures and allied works;
2.Survey, review the designs, redesign where necessary, and diversion works of Nallahs with interception sewer of about DI-K7 class pipe of 150 mm diameter having total length of 200 m from pumping station to near Manhole /STP.
3.Provision for Catch Basins for collecting Drains Having Width Lessor More than 75cm to manhole.
4.Construction of 2.0 Nos Pumping Station.
5.Reuse plan: - 1.0 RCC Sump Capacity-13 Kl with Pump And 150 mm Dia DI-K7 Pipe Length-50 with Allied Work
6.Plantation work both side of nalla And STP Campus with allied works.
7. Providing, laying, jointing, testing, commissioning of Sewage Gravity main of RCC NP-3 pipe having length of 1412 m of Dia 400mm.
8.Establishment of Online Control Monitoring System OCMS. | 1 | Lump-Sum | 3,84,31,514 ₹3.8 Cr | 4,02,59,354 ₹4.0 Cr | 4,04,29,782 ₹4.0 Cr |
| 2.00 | Operation and Maintenance Cost For 1st Years | 1 | Lump-Sum | 6,50,000 ₹6.5 L | 12,09,000 ₹12.1 L | 10,50,000 ₹10.5 L |
| 3.00 | Operation and Maintenance Cost For 2nd Years | 1 | Lump-Sum | 6,82,500 ₹6.8 L | 13,24,920 ₹13.2 L | 10,50,000 ₹10.5 L |
| 4.00 | Operation and Maintenance Cost For 3rd Years | 1 | Lump-Sum | 7,16,625 ₹7.2 L | 13,71,618 ₹13.7 L | 10,50,000 ₹10.5 L |
| 5.00 | Operation and Maintenance Cost For 4th Years | 1 | Lump-Sum | 7,53,245 ₹7.5 L | 14,28,448 ₹14.3 L | 10,50,000 ₹10.5 L |
| 6.00 | Operation and Maintenance Cost For 5th Years | 1 | Lump-Sum | 7,90,080 ₹7.9 L | 14,91,322 ₹14.9 L | 10,50,000 ₹10.5 L |
| 7.00 | Operation and Maintenance Cost For 6th Years | 1 | Lump-Sum | 8,29,584 ₹8.3 L | 15,50,888 ₹15.5 L | 10,50,000 ₹10.5 L |
| 8.00 | Operation and Maintenance Cost For 7th Years | 1 | Lump-Sum | 8,71,064 ₹8.7 L | 15,55,888 ₹15.6 L | 10,50,000 ₹10.5 L |
| 9.00 | Operation and Maintenance Cost For 8th Years | 1 | Lump-Sum | 9,14,618 ₹9.1 L | 16,05,993 ₹16.1 L | 10,50,000 ₹10.5 L |
| 10.00 | Operation and Maintenance Cost For 9th Years | 1 | Lump-Sum | 9,60,349 ₹9.6 L | 16,58,453 ₹16.6 L | 10,50,000 ₹10.5 L |
Tender Value
₹4.3 Cr
EMD Value
₹2.1 L
Closing Date
25 Mar 2026, 5:30 pmClosed
cmo karnawad
nagar parishad karnawad
Interception And Diversion Work for tapping Nallahs and setup STP for Used Water management for KARNAWAD Town under SBM 2.0
2026_UAD_484599_1
339
Open Tender
Civil Works - Others
365 days
karnawad
Please refer Tender documents.
2 documents required · 2 mandatory
₹15,000
₹2.1 L
15 Apr 2026
23 Feb 2026
28 Mar 2026
23 Feb 2026
25 Mar 2026
20 Mar 2026
Interception And Diversion Work for tapping Nallahs and setup STP for Used Water Management for KARNAWAD Town under SBM 2.0
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
techsummary_569714.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
484599.pdf
Tender Documents • 1.96 MB
Specificationskr.pdf
Other Document • 2.34 MB
BOQ_569714.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid