| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 CrAdmitted-Finance | ₹5.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹6.2 Cr+₹42.0 L (7.29%)Admitted-Finance | ₹6.2 Cr+₹42.0 L (7.29%) | L2 | Admitted-Finance |
| 3 | L3₹6.9 Cr+₹1.1 Cr (19.6%)Admitted-Finance | ₹6.9 Cr+₹1.1 Cr (19.6%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical technically disqualified |
| Sl No | Description | Qty | Unit | S K ELECTRICAL WORKS L1 | RELIABLE INDUSTRIAL SOLUTION L3 | RAMA INDUSTRIES L2 |
|---|---|---|---|---|---|---|
| 1.00 | 1.Design and build sewage treatment plant of installed capacity 1.00 MLD and all appurtenant structures and allied works;
2.Survey, review the designs, redesign where necessary, and diversion works of Nallahs with interception sewer of about DI-K7 class pipe of 150 mm diameter having total length of 200 m from pumping station to near Manhole /STP.
3.Provision for Catch Basins for collecting Drains Having Width Lessor More than 75cm to manhole.
4.Construction of 2.0 Nos Pumping Station.
5.Reuse plan: - 1.0 RCC Sump Capacity-13 Kl with Pump And 150 mm Dia DI-K7 Pipe Length-50 with Allied Work
6.Plantation work both side of nalla And STP Campus with allied works.
7. Providing, laying, jointing, testing, commissioning of Sewage Gravity main of RCC NP-3 pipe having length of 1412 m of Dia 400mm.
8.Establishment of Online Control Monitoring System OCMS. | 1 | Lump-Sum | 3,84,31,514 ₹3,84,31,514 Lowest | 4,02,59,354 ₹4,02,59,354 | 4,04,29,782 ₹4,04,29,782 |
| 2.00 | Operation and Maintenance Cost For 1st Years | 1 | Lump-Sum | 6,50,000 ₹6,50,000 Lowest | 12,09,000 ₹12,09,000 | 10,50,000 ₹10,50,000 |
| 3.00 | Operation and Maintenance Cost For 2nd Years | 1 | Lump-Sum | 6,82,500 ₹6,82,500 Lowest | 13,24,920 ₹13,24,920 | 10,50,000 ₹10,50,000 |
| 4.00 | Operation and Maintenance Cost For 3rd Years | 1 | Lump-Sum | 7,16,625 ₹7,16,625 Lowest | 13,71,618 ₹13,71,618 | 10,50,000 ₹10,50,000 |
| 5.00 | Operation and Maintenance Cost For 4th Years | 1 | Lump-Sum | 7,53,245 ₹7,53,245 Lowest | 14,28,448 ₹14,28,448 | 10,50,000 ₹10,50,000 |
| 6.00 | Operation and Maintenance Cost For 5th Years | 1 | Lump-Sum | 7,90,080 ₹7,90,080 Lowest | 14,91,322 ₹14,91,322 | 10,50,000 ₹10,50,000 |
| 7.00 | Operation and Maintenance Cost For 6th Years | 1 | Lump-Sum | 8,29,584 ₹8,29,584 Lowest | 15,50,888 ₹15,50,888 | 10,50,000 ₹10,50,000 |
| 8.00 | Operation and Maintenance Cost For 7th Years | 1 | Lump-Sum | 8,71,064 ₹8,71,064 Lowest | 15,55,888 ₹15,55,888 | 10,50,000 ₹10,50,000 |
| 9.00 | Operation and Maintenance Cost For 8th Years | 1 | Lump-Sum | 9,14,618 ₹9,14,618 Lowest | 16,05,993 ₹16,05,993 | 10,50,000 ₹10,50,000 |
| 10.00 | Operation and Maintenance Cost For 9th Years | 1 | Lump-Sum | 9,60,349 ₹9,60,349 Lowest | 16,58,453 ₹16,58,453 | 10,50,000 ₹10,50,000 |
Tender Value
₹4.3 Cr
EMD Value
₹2.1 L
Closing Date
25 Mar 2026, 5:30 pmClosed
cmo karnawad
nagar parishad karnawad
Interception And Diversion Work for tapping Nallahs and setup STP for Used Water management for KARNAWAD Town under SBM 2.0
2026_UAD_484599_1
339
Open Tender
Civil Works - Others
Lump-sum
365 days
karnawad
Please refer Tender documents.
2 documents required · 2 mandatory
₹15,000
₹2.1 L
15 Apr 2026
23 Feb 2026
28 Mar 2026
23 Feb 2026
25 Mar 2026
20 Mar 2026
Interception And Diversion Work for tapping Nallahs and setup STP for Used Water Management for KARNAWAD Town under SBM 2.0
stage.html
html • 0.03 MB
techsummary_569714.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
484599.pdf
Tender Documents • 1.96 MB
Specificationskr.pdf
Other Document • 2.34 MB
BOQ_569714.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .