| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 CrAccepted-Finance | ₹3.7 Cr | L1 | Accepted-Finance Qualified |
| 2 | L2₹3.7 Cr+₹3.7 L (1.01%)Rejected-Finance | ₹3.7 Cr+₹3.7 L (1.01%) | L2 | Rejected-Finance Disqualified |
| 3 | L3₹3.7 Cr+₹4.3 L (1.17%)Rejected-Finance ADD EKAUNA BAIPAS DISTRICT SHRAWASTI | SHRAVASTI | UTTAR PRADESH | 271201 | ₹3.7 Cr+₹4.3 L (1.17%) | L3 | Rejected-Finance Disqualified |
| 4 | Rejected-Technical MOHALLA SARASWATI NAGAR DISTRICT BAHRAICH | BAHRAICH | UTTAR PRADESH | 271801 | - | - | Rejected-Technical Did not qualify in technical bid |
| 5 | Rejected-Technical 208 L MODEL TOWN LUDHIANA | LUDHIANA | LUDHIANA | PUNJAB | - | - | Rejected-Technical Did not qualify in technical bid |
| Sl No | Description | Qty | Unit | M/S SHREE ANSH CONSTRUCTION L1 | M/S MITHILESH KUMAR SHUKLA CONTRACTOR L3 | M/S PRABHAT TRADERS L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in making diversion including including all leads and lifts, excluding mechanical compaction but including manual compaction and dressing to profile for canal embankment upto 1.5M height for proper completion of work as per direction of Engineer-in-Charge. | 242.36 | Cum | 80 ₹19,388.8 | 65 ₹15,753.4 Lowest | 75 ₹18,177 |
| 2.00 | Dismantling of Brick Work with lime/cement mortar and its proper disposal including cost of labour, T&P etc for proper completion of work as per direction of Engineer-in-Charge. | 254.62 | Cum | 460 ₹1,17,125.2 | 420 ₹1,06,940.4 Lowest | 460 ₹1,17,125.2 |
| 3.00 | Dismantling of Reinforcement Cement Concrete work and its proper disposal including cost of labour, T&P etc for proper completion of work as per direction of Engineer-in-Charge. | 8.64 | Cum | 695 ₹6,004.8 Lowest | 700 ₹6,048 | 695 ₹6,004.8 Lowest |
| 4.00 | Dismantling of Cement concrete work with lime/cement mortar and its proper disposal including cost of labour, T&P etc for proper completion of work as per direction of Engineer-in-Charge. | 91.56 | Sqm | 35 ₹3,204.6 Lowest | 38 ₹3,479.28 | 35 ₹3,204.6 Lowest |
| 5.00 | Laying dismantled Brick at approach including cost of all material (but excluding cost of dismantled brick ballast) & including cost of labour and T&P etc for proper completion of work as per direction of Engineer-in-Charge. | 152.8 | Cum | 340 ₹51,952 Lowest | 345 ₹52,716 | 340 ₹51,952 Lowest |
| 6.00 | Earthwork in excavation of foundation for civil stucture including all leads and lifts and its disposal for proper completion of work as per direction of Engineer-in-Charge. | 1,047.65 | Cum | 88 ₹92,193.2 Lowest | 95 ₹99,526.75 | 88 ₹92,193.2 Lowest |
| 7.00 | Providing and laying in position cement concrete 1:3:6 (1 Cement : 3 Dala coarse sand of FM not less than 2.0 : 6 Kabrai graded stone aggregate 20 to 40 mm size) including cost of all materials, labour, T&P etc for proper completion of work as per direction of Engineer-in-Charge. | 48.3 | Cum | 11,600 ₹5,60,280 Lowest | 12,500 ₹6,03,750 | 11,900 ₹5,74,770 |
| 8.00 | Providing and laying in position reinforced cement concrete 1:1.5:3 (1 Cement : 1.5 Dala coarse sand of FM not less than 2.0 : 3 Kabrai graded stone aggregate 10 to 20 mm size) including cost of all materials, labour, T&P etc for proper completion of work as per direction of Engineer-in-Charge. | 338.98 | Cum | 11,500 ₹38,98,270 Lowest | 12,500 ₹42,37,250 | 11,500 ₹38,98,270 Lowest |
| 9.00 | Centering and shuttering including strutting, propping etc. and removal of form for RCC Work including cost of all materials, labour, T&P etc for proper completion of work as per direction of Engineer-in-Charge. | 1,016.62 | Sqm | 600 ₹6,09,972 Lowest | 850 ₹8,64,127 | 700 ₹7,11,634 |
| 10.00 | Centering and shuttering including strutting, propping etc. and removal of form for PCC Work including cost of all materials, labour, T&P etc for proper completion of work as per direction of Engineer-in-Charge. | 696.63 | Sqm | 350 ₹2,43,820.5 Lowest | 410 ₹2,85,618.3 | 350 ₹2,43,820.5 Lowest |
Tender Value
₹3.9 Cr
EMD Value
₹7.7 L
Closing Date
24 Aug 2026, 3:00 pmClosed
Superintending Engineer
office of the Superintending Engineer Drainage Circle Gonda
Rehabilitation of the canals of Rampur Reservoir System in the district of Shrawasti.
2026_UPIDC_1176920_1
01/SE/2026-27
Open Tender
Civil Works - Canal
Item Rate
180 days
Sharwasti
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹7.7 L
11 Sept 2026
14 Aug 2026
24 Aug 2026
14 Aug 2026
24 Aug 2026
14 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in making diversion including including all leads and lifts, excluding mechanical compaction but including manual compaction and dressing to profile for canal embankment upto 1.5M height for proper completion of work as per direction of Engineer-in-Charge. | 242.36 | Cum | - | - |
| 2 | Dismantling of Brick Work with lime/cement mortar and its proper disposal including cost of labour, T&P etc for proper completion of work as per direction of Engineer-in-Charge. | 254.62 | Cum | - | - |
| 3 | Dismantling of Reinforcement Cement Concrete work and its proper disposal including cost of labour, T&P etc for proper completion of work as per direction of Engineer-in-Charge. | 8.64 | Cum | - | - |
| 4 | Dismantling of Cement concrete work with lime/cement mortar and its proper disposal including cost of labour, T&P etc for proper completion of work as per direction of Engineer-in-Charge. | 91.56 | Sqm | - | - |
| 5 | Laying dismantled Brick at approach including cost of all material (but excluding cost of dismantled brick ballast) & including cost of labour and T&P etc for proper completion of work as per direction of Engineer-in-Charge. | 152.8 | Cum | - | - |
| 6 | Earthwork in excavation of foundation for civil stucture including all leads and lifts and its disposal for proper completion of work as per direction of Engineer-in-Charge. | 1,047.65 | Cum | - | - |
| 7 | Providing and laying in position cement concrete 1:3:6 (1 Cement : 3 Dala coarse sand of FM not less than 2.0 : 6 Kabrai graded stone aggregate 20 to 40 mm size) including cost of all materials, labour, T&P etc for proper completion of work as per direction of Engineer-in-Charge. | 48.3 | Cum | - | - |
| 8 | Providing and laying in position reinforced cement concrete 1:1.5:3 (1 Cement : 1.5 Dala coarse sand of FM not less than 2.0 : 3 Kabrai graded stone aggregate 10 to 20 mm size) including cost of all materials, labour, T&P etc for proper completion of work as per direction of Engineer-in-Charge. | 338.98 | Cum | - | - |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for RCC Work including cost of all materials, labour, T&P etc for proper completion of work as per direction of Engineer-in-Charge. | 1,016.62 | Sqm | - | - |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for PCC Work including cost of all materials, labour, T&P etc for proper completion of work as per direction of Engineer-in-Charge. | 696.63 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.27 MB
BOQ_2211643.xls
BOQ • 0.27 MB
BiDLot04Reten.pdf
Tender Documents • 15.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .