| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC | ₹2.6 L | L1 | Accepted-AOC Being the lowest bidder. |
| 2 | L2₹3.2 LRejected-Finance | ₹3.2 L | L2 | Rejected-Finance Rejected being the L2. |
| 3 | Rejected-Technical | - | - | Rejected-Technical The bidder has not uploaded the requisite documents as per NIT connditions. |
| 4 | Rejected-Technical | - | - | Rejected-Technical The bidder has not uploaded the requisite documents as per NIT connditions. |
| 5 | Rejected-Technical | - | - | Rejected-Technical The bidder has not uploaded the requisite documents as per NIT connditions. |
| Sl No | Description | Qty | Unit | Niloke Enterprise L2 | M/S CREST ENTERPRISE L1 |
|---|---|---|---|---|---|
| 1.00Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 min width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | |||||
| 1.01 | All kinds of soil | 12 | One Cubic Metre | 200 ₹2,400 | 150 ₹1,800 |
| 2.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 4 | One Cubic Metre | 190 ₹760 | 200 ₹800 |
| 3.00 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 6 | One Square Metre | 17 ₹102 | 200 ₹1,200 |
| 4.00Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material | |||||
| 4.01 | Beyond 30 cm girth upto and including 60 cm girth | 1 | Each | 500 ₹500 | 2,000 ₹2,000 |
| 5.00Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 5.01 | 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | 1.3 | One Cubic Metre | 7,500 ₹9,750 | 6,500 ₹8,450 |
| 6.00Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | |||||
| 6.01 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 4 | One Cubic Metre | 11,000 ₹44,000 | 6,500 ₹26,000 |
Tender Value
₹3.4 L
EMD Value
₹6,860
Closing Date
17 Nov 2025, 3:00 pmClosed
Executive Engineer(Civil)
BSNL Civil Division, Type-V Qtr-2, Walford, Dimapur.
Reconstruction of damaged compound wall at front side of BSNL Staff Quarter Compound, PnT Colony, Dimapur, Nagaland.
2025_BSNL_254939_1
11 of 2025-26/BCD/DMP
Open Tender
Civil Works
60 days
BSNL Staff Quarters, PnT Colony, Dimapur.
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Yes
Accounts Officer(Claim), O/o GM, NLD BA, Dimapur.
₹6,860
Yes
17 Jan 2026
10 Nov 2025
18 Nov 2025
10 Nov 2025
17 Nov 2025
10 Nov 2025
10 Nov 2025 - 17 Nov 2025
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 min width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift.
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material
Beyond 30 cm girth upto and including 60 cm girth
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for
Foundations, footings, bases of columns, etc. for mass concrete
Lintels, beams, plinth beams, girders, bressumers and cantilevers
Columns, Pillars, Piers, Abutments, Posts and Struts
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
Brick work 7 cm thick with common burnt clay F.P.S. (non modular) brick of class designation 7.5 in cement mortar 1:3 (1 cement : 3 coarse sand) in superstructure above plinth level and upto floor five level.
Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundations and plinth in :
Cement mortar 1:4 (1 Cement : 4 Coarse sand)
Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level
Cement mortar 1:4 (1 Cement : 4 Coarse sand)
12 mm cement plaster of mix :
1:6 (1 Cement: 6 Coarse sand)
15 mm cement plaster on the rough side of single or half brick wall of mix :
1:6 (1 Cement: 6 Coarse sand)
Finishing walls with Acrylic Smooth exterior paint of required shade :
New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm)
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :
Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
In cement mortar
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used.
With G.I. barbed wire
Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction drilling holes upto 10 mm dia. etc. complete.
Credit for taking into possession materials obtained from dismantling including carriage:
Bricks
Steel angles
Niloke Enterprise (BID ID -927439)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
Tender11.pdf
Tender Documents • 1.87 MB
BOQ_293661.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid