| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹88.5 LAccepted-AOC | ₹88.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹92.1 LRejected-AOC | ₹92.1 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Rajrath Construction L2 | Subhash Construction L1 |
|---|---|---|---|---|---|
| 1.00 | Demolition including stacking of serviceable materilas and disposal of unserviceable materials with all lead and lift. (i) R.C.C. work | 9.32 | Cum | 1,010 ₹9,413.2 Lowest | 2,828 ₹26,356.96 |
| 2.00 | Demolition of Brick work and stone masonry including stacking of serviceable materilas and disposal of unserviceable materials with all lead and lift.(ii) In Cement Mortar. | 21.41 | Cum | 303 ₹6,487.23 Lowest | 1,919 ₹41,085.79 |
| 3.00 | Dismentling steel work including distempering and stacking the materials with all lead and lift | 397.25 | Kg | 3.73 ₹1,481.74 Lowest | 10.1 ₹4,012.23 |
| 4.00 | Supplying material and labour for filling with good quality garden soil obtained from outside, including watering, ramming well, consolidating, compacting dressing and maintenance for 2 months etc. complete, as directed. Dressing and leveling the area by spreading 2"-3" of good quality soil & manual compaction as required and as approved by EIC. | 121.8 | Cum | 1,616 ₹1,96,828.8 | 1,515 ₹1,84,527 Lowest |
| 5.00 | Filling in foundation and plinth with murrum or selected soil in layers of 20cm. thickness including watering, ramming and consolidating etc. complete. | 420 | Cum | 918.08 ₹3,85,593.6 | 909 ₹3,81,780 Lowest |
| 6.00 | Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(C) Hard Murrum | 229.65 | Cum | 204.01 ₹46,850.9 Lowest | 303 ₹69,583.95 |
| 7.00 | Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(C) Hard Murrum | 153.1 | Cum | 102 ₹15,616.2 Lowest | 404 ₹61,852.4 |
| 8.00 | Filling available excavated earth (excluding rock) in trenches. plinth, sides of foundations etc. in layers not exceeding 20 cm. in depth consolidating each disposited layer by ramming and watering. | 382.75 | Cum | 50.99 ₹19,516.42 Lowest | 119.18 ₹45,616.15 |
| 9.00 | Providing material and labour for laying Plain cement concrete M15 in Foundation and Plinth including cost of formwork, compacting, finishing, curing etc complete for all level, all height/ depth as directed by engineer in charge. | 129.33 | Cum | 9,690.94 ₹12,53,329.27 | 7,070 ₹9,14,363.1 Lowest |
| 10.00 | Providing and laying controlled cement concrete M.250 and curing complete excluding the cost of formwork and reinforcement for reinforced concrete work in (A) Foundations, footings, Base of columns and Mass concrete. (upto 10 ton) | 53.28 | Cum | 9,090 ₹4,84,315.2 Lowest | 9,999 ₹5,32,746.72 |
Tender Value
₹71.4 L
EMD Value
₹1.4 L
Closing Date
9 Apr 2026, 2:00 pmClosed
Executive Engineer, PWD,WD-I(B),DNH,Silvassa
PWD Campus Block No.I(Bldg), DNH, Silvassa
Construction of Pathway, Entrance Gate And Landscaping at Boys Hostel Randha.
2026_UTDNH_7977_1
E-TENDER NOTICE NO.60 OF 2025-26 (BLDG)
Open Tender
Civil Works - Bridges
Item Rate
90 days
UT OF DNH
As per NIT refer
3 documents required · 3 mandatory
₹1,000
Executive Engineer, PWD,WD-I(B),DNH,Silvassa
₹1.4 L
11 Aug 2026
30 Mar 2026
9 Apr 2026
30 Mar 2026
9 Apr 2026
30 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Demolition including stacking of serviceable materilas and disposal of unserviceable materials with all lead and lift. (i) R.C.C. work | |||||
| 2Demolition of Brick work and stone masonry including stacking of serviceable materilas and disposal of unserviceable materials with all lead and lift.(ii) In Cement Mortar. | |||||
| 3Dismentling steel work including distempering and stacking the materials with all lead and lift | |||||
| 4Supplying material and labour for filling with good quality garden soil obtained from outside, including watering, ramming well, consolidating, compacting dressing and maintenance for 2 months etc. complete, as directed. Dressing and leveling the area by spreading 2"-3" of good quality soil & manual compaction as required and as approved by EIC. | |||||
| 5Filling in foundation and plinth with murrum or selected soil in layers of 20cm. thickness including watering, ramming and consolidating etc. complete. | |||||
| 6Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(C) Hard Murrum | |||||
| 7Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(C) Hard Murrum | |||||
| 8Filling available excavated earth (excluding rock) in trenches. plinth, sides of foundations etc. in layers not exceeding 20 cm. in depth consolidating each disposited layer by ramming and watering. | |||||
| 9Providing material and labour for laying Plain cement concrete M15 in Foundation and Plinth including cost of formwork, compacting, finishing, curing etc complete for all level, all height/ depth as directed by engineer in charge. | |||||
| 10Providing and laying controlled cement concrete M.250 and curing complete excluding the cost of formwork and reinforcement for reinforced concrete work in (A) Foundations, footings, Base of columns and Mass concrete. (upto 10 ton) | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
BOQ_8171.xls
BOQ • 0.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].