Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance GOVT CONTRACTOR 1 32 MOHAMMED HOUSE 23 JIRGATANG SOUTH ANDAMAN PIN 744206 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744206 | Admitted-Finance |
| 4 | Admitted-Finance VALLUVAR NAGAR BAMBOOFLAT SOUTH ANDAMAN PIN 744107 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744107 | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹1.4 L
Closing Date
4 Jan 2022, 3:00 pmClosed
The Deputy Conservator of Forests
Office of The Deputy Conservator of Forests Wildlife Haddo
Labour Components for Construction of RCC Retaining Wall adjacent to store Godown at Haddo
2021_DCFWL_4772_1
WL/G-3/6/Vol-V/1825
Open Tender
Construction Works
Works
20 days
Store Godown at Haddo
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
Exempted
4 Jan 2022
24 Dec 2021
4 Jan 2022
24 Dec 2021
4 Jan 2022
24 Dec 2021
Amount
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Labour charges for laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).
Labour charges for laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Labour charges for filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Labour charges for Centring and shuttering including strutting, propping etc. and removal of form for : a)Foundations, footings, bases of columns, etc. for mass concrete.
Labour charges for Centring and shuttering including strutting, propping etc. and removal of form for : b)Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
Labour charges for Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars
Labour charges for 12 mm cement plaster of mix 1:4 (1 cement : 4 coarse sand :
Labour charges for Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
B S ENGINEERING
ARJUN MANDAL
Haneefa Constructions
M/s Ammu Construction
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .