Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.4 CrAccepted-Finance OFFICE NO S9 PLOT NO 71 AISHWARYAM ONE PIMPRI CHINCHWAD PUNE MAHARASHTRA 411019 UDYAM MH 26 0085562 27ABFCS3321K1ZA R M | PUNE | MAHARASHTRA | 411019 | ₹1.4 Cr | 1 | Accepted-Finance Prices are final negotiated without SI No 27 of BOQ .Included of GST |
| 2 | Rejected-Technical UNIT 1 DEE DEVELOPMENTENGINEERS LIMITED PRITHLA TATARPUR ROAD VILLAGE TATARPUR DIST PALWAL HARYANA 121102 INDIA PALWAL HARYANA 121102 | PALWAL | HARYANA | 121102 | - | - | Rejected-Technical Bidder is rejected as bidder has not provided PI Diagram,not provided process details,not provided design calculation,not provided detailed BOM with technical specs. |
| 3 | Rejected-Technical EL 31 14 J BLOCK MIDC BHOSARI PUNE MAHARASHTRA 411026 UDYAM MH 26 0069235 | PUNE | MAHARASHTRA | 411026 | - | - | Rejected-Technical Bidder is rejected as bidder has not provided complaince sheet and taken deviation in commercial terms,not provided process details,not provided design calculation,not provided detailed BOM with technical specs. |
Tender Value
Refer Docs
Closing Date
27 Jan 2025, 6:00 pmClosed
Mr.Gulrej Naikwadi
Thermax Ltd ,D 13 RD Aga Road MIDC Area Chinchwad Pune 411019
Design, manufacturing supply installation Commissioning of Skid Mounted Single Tube Reactor test setup
2024_DST_839159_1
TL/CCU2401/2024/OTN-01
Open Tender
Mechanical Tools and Equipment
Supply
112 days
Pune
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
Thermax Ltd ,Chinchwad Pune
6 Mar 2025
12 Dec 2024
28 Jan 2025
12 Dec 2024
27 Jan 2025
12 Dec 2024
27 Dec 2024
Gas connection line of CO2 complete with ball valve, filter, inline pressure regulating valve with inlet outlet pressure gauge, pressure safety valve, mass flow controller and non-return valve.
Gas connection line of H2 complete with ball valve, filter, inline pressure regulating valve with inlet outlet pressure gauge, pressure safety valve, mass flow controller and non-return valve.
Gas connection line of CO complete with ball valve, filter, inline pressure regulating valve with inlet outlet pressure gauge, pressure safety valve, mass flow controller and non-return valve.
Gas connection line of N2 complete with ball valve, filter, inline pressure regulating valve with inlet outlet pressure gauge, pressure safety valve, mass flow controller and non-return valve.
Gas manifold for connecting 4 CO2 cylinders along with necessary isolation valves. PT with low pressure alarm
Gas manifold for connecting 8 H2 cylinders along with necessary isolation valves. PT with low pressure alarm
Gas manifold for connecting 4 CO cylinders along with necessary isolation valves. PT with low pressure alarm
Gas manifold for connecting 4 N2 cylinders along with necessary isolation valves. PT with low pressure alarm
Feed tank-01 43A-TT-01 complete with manual feeding option, pressure gauge, level transmitter, temperature element, provisions of N2 blanketing and necessary accessories viz. isolation valve, pressure safety valve, tubing/hose, drain nozzle with double valve system etc.
Dosing pumps 43A-PA-01 complete with inlet/outlet isolation valves for transfer of liquid feed, tubing/hoses, strainers etc.
Static mixture (43A-SM-01)
Auto Sample handling and switchover system with necessary accessories as mentioned in annexure T1 to T3
Manual Sampling handling system with necessary accessories as mentioned in annexure T1 to T3
Feed heater 43A-FH-01: as mentioned in annexure T1 to T3
Reactor 1 43A-RE-01: as mentioned in annexure T1 to T3
Reactor 2 43A-RE-02: as mentioned in annexure T1 to T3
Thermosyphon loop: as mentioned in annexure T1 to T3
Product cooler 43A-EE-01: as mentioned in annexure T1 to T3
Water Chiller 43A-WC-01: as mentioned in annexure T1 to T3
Gas-liquid separator 43A-VV-01: as mentioned in annexure T1 to T3
Product storage tank-02 43A-TT-02: as mentioned in annexure T1 to T3
Skid for single tube reactor unit
All tubing, fittings, valves, tubing work: as mentioned in annexure T1 to T3
All miscellaneous E&I items: as mentioned in annexure T1 to T3
Power and control Panel, with PLC & required hardware, software, cables, field equipment and overall electrical work as mentioned in annexure T1 to T3
Installation, testing and commissioning work: as mentioned in annexure T1 to T3
Spares as mentioned in Section K
Gas Detectors as mentioned in Annexure – T1 to T3.
Line Heaters as mentioned in Annexure – T1 to T3
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].