Loading…
Loading…
Tender Value
₹1.9 Cr
EMD Value
₹2.4 L
Closing Date
18 Sept 2026, 5:00 pm
Staff Officer Civil SECL Korba Area
Office of the General Manager, South Eastern Coalfields Limited, CIVIL DEPARTMENT, KORBA AREA KORBA- 495 677(CG)
Renovation of Boundary Wall around Bagdewa Incline under DSB Sub Area of SECL Korba Area
2026_SECL_364726_1
SECL/GM/KA/C/e-Tender/26-27/39 Dt. 02.09.2026
Open Tender
Civil Works - Others
Item Rate
180 days
Office of General Manager SECL Korba Area
As per NIT
5 documents required · 5 mandatory
₹2.4 L
2 Sept 2026
2 Sept 2026
21 Sept 2026
3 Sept 2026
18 Sept 2026
3 Sept 2026
3 Sept 2026 - 11 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil Works | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 754.51 | Cum | 187.35 | ₹1,41,357.45 |
| 1.02 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand(zone-III) : 6 graded stone aggregate 40 mm nominal size). | 109.43 | Cum | 5,091.9 | ₹5,57,206.62 |
| 1.03 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 225.15 | Cum | 6,660.3 | ₹14,99,566.55 |
| 1.04 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) | 79.68 | Cum | 7,803.8 | ₹6,21,806.78 |
| 1.05 | Reinforced cement concrete work in beams, suspended floors, roofs having
slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 70.47 | Cum | 8,201.95 | ₹5,77,991.42 |
| 1.06 | Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts | 1,267.2 | Sqm | 663.15 | ₹8,40,343.68 |
| 1.07 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete | 1,921.63 | Sqm | 278.1 | ₹5,34,405.3 |
| 1.08 | Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers | 612.83 | Sqm | 633.15 | ₹3,88,013.31 |
| 1.09 | Brick work with clay flyash brick F.P.S. (non modular), class designation 7.5 in foundation and plinth in cement mortar 1:6 ( 1 cement : 6 coarse sand ) | 140.95 | cum | 4,896.1 | ₹6,90,105.3 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.87 MB
Tendernotice_2.pdf
PDF • 1.48 MB
Tendernotice_3.pdf
PDF • 0.09 MB
BOQ_377703.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .