Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.4 LAdmitted-Finance 146 D POCKET B MAYUR VIHAR PHASE II DELHI 110091 EAST DELHI 110091 | EAST | DELHI | 110091 | -6.71% | ₹12.4 L | L1 | Admitted-Finance |
| 2 | L2₹12.5 L+₹12,219.37 (0.99%)Admitted-Finance | -5.79% | ₹12.5 L+₹12,219.37 (0.99%) | L2 | Admitted-Finance |
| 3 | L3₹13.1 L+₹74,378.77 (6.00%)Admitted-Finance | -1.11% | ₹13.1 L+₹74,378.77 (6.00%) | L3 | Admitted-Finance |
Tender Value
₹13.3 L
EMD Value
₹26,564
Closing Date
14 Aug 2026, 12:00 pmClosed
DEPUTY CONSERVATOR OF FOREST
DEPUTY CONSERVATOR OF FOREST, TONK
Nursery bed and seed Storage Room Construction in Nursery Bhojpura and Sanjay van
2026_FORES_585396_1
22/2026-27
Open Tender
Agricultural or Forestry
Percentage
50 days
Bhojpura and Newai
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
As Per Nit
₹26,564
Yes
18 Aug 2026
10 Aug 2026
14 Aug 2026
10 Aug 2026
14 Aug 2026
10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Seed Room Nursery Bhojpura | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | - | Cum | 178 | - |
| 1.02 | Earth work in excavation/ by mechanical means (Hydraulic Excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50 m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed: | - | - | - | - |
| 1.03 | Hard rock(blasting prohibited) useful material 30% | 0.4 | cum | 540 | ₹216 |
| 1.04 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. | - | - | - | - |
| 1.05 | PCC 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 1 | Cum | 3,302 | ₹3,301.67 |
| 1.06 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in: | - | - | - | - |
| 1.07 | Cement Mortar 1:6 ( 1-Cement : 6-Sand). | 0.8 | Cum | 2,838 | ₹2,270.4 |
| 1.08 | Filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift. | - | Cum | 64 | - |
| 1.09 | Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in : | - | - | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.90 MB
BOQ_1040061.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .