Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.8 LAccepted-AOC BANDARAILAH MALDA | MALDA | MALDA | WEST BENGAL | ₹62.8 L | L1 | Accepted-AOC L1-Accepted |
| 2 | L2₹63.2 LRejected-Finance 00 DEY ENTERPRISE SODEPUR 9 10 PITS COLLIERY ASANSOL BARDHAMAN WEST BENGAL 713372 UDYAM WB 23 0013338 | PASCHIM BARDHAMAN | WEST BENGAL | 713372 | ₹63.2 L | L2 | Rejected-Finance Higher than L1 |
| 3 | L3₹63.9 LRejected-Finance BIBIGRAM SOUTH NEAR JALALIA GIRLS HIGH SCHOOL MALDA ENGLISHBAZAR 732101 | ENGLISHBAZAR | MALDA | WEST BENGAL | 732101 | ₹63.9 L | L3 | Rejected-Finance Higher than L1 |
| Sl No | Description | Qty | Unit | HANNAN BUILDERS PRIVATE LIMITED L3 | DEY ENTERPRISE L2 | NABAUDYAG ELECTRICAL ENGINEERING CO OP. SOC. LTD. L1 |
|---|---|---|---|---|---|---|
| 1.00 | Supply, delivery and storage at site of Vertical Turbine Pump with discharge head assembly, sole plate, companion flange, thrust bearing housing with coupling, NRR assembly and motor stool, self water lubricated column and shaft assembly, bowl assembly and basket strainer having the following specification.
Discharge :- 150 m3 per hour
Generated Head :- 35 MWC
H-Q-P Curve of pumps, Datasheet, General Arrangement of drawing and Pump Manufacturing Quality Plan has to be submitted during the delivery.
(Pumps should be suitable for PLC operated unmaned operation facility and pumping clear water form CWR at Narayanpur Distribution Zone to one (01) nos OHR
For further specification go through NIeT. | 2 | Sets | 6,44,332 ₹12.9 L | 6,38,700 ₹12.8 L | 6,32,500 ₹12.7 L |
| 2.00 | Supply, delivery and storage at site of 4 pole, 1500 RPM, AC, 3 Phase, 50 Hz, 415 V, 30 KW IE-3 Vertical Flange Mounted squirrel cage induction motor suitable for the pump duty mentioned above ( item No- 1.00) with adequate margin.
For further specification go through NIeT.
Routine test certificate of Induction Motor has to be submitted during delivery | 2 | Sets | 2,42,179 ₹4.8 L | 2,39,200 ₹4.8 L | 2,37,800 ₹4.8 L |
| 3.00 | Supply, delivery and storage at site of CI doble flanged single door swing check 200 mm dia N.R.V with by-pass arrangement as per IS : 5312, Part-I, PN-1.0 N.B. : Test Certificate to be produced for each valve.
(AT DELIVERY SIDE OF PUMP) | 2 | Sets | 24,870 ₹49,740 | 26,200 ₹52,400 | 24,300 ₹48,600 |
| 4.00 | Supply, delivery and storage at site 200 mm dia double flanged Cast Iron actuator operated butterfly valve generally conforming to BS 5155 and disc conforming to IS:210 ,PN-1.0. N.B. : Test Certificate to be produced for each valve.
(AT DELIVERY SIDE OF PUMP ) | 2 | Nos. | 93,198 ₹1.9 L | 92,600 ₹1.9 L | 91,550 ₹1.8 L |
| 5.00 | Supply, delivery and storage at site 200 mm dia double flanged Cast Iron gear operated butterfly valve generally conforming to BS 5155 and disc conforming to IS:210 PN-1.6 N.B. : Test Certificate to be produced for each valve.
(AT COMMON DELIVERY HEADER ) | 1 | No. | 23,277 ₹23,277 | 23,600 ₹23,600 | 22,750 ₹22,750 |
| 6.00 | Supply, delivery and storage at site 80 mm dia Cast Iron kinetic double orifice air released valve as per relevant IS, PN-1.6. N.B. : Test Certificate to be produced for each valve.
(AT COMMON DELIVERY HEADER ) | 1 | No. | 15,047 ₹15,047 | 15,300 ₹15,300 | 14,650 ₹14,650 |
| 7.00Supply, delivery and storage at site suitable M.S. Dismantling Joint | ||||||
| 7.01 | DN 200 mm PN 1.0 ( for Delivery side & common header of pump ) | 3 | Nos. | 12,345 ₹37,035 | 12,400 ₹37,200 | 12,100 ₹36,300 |
| 8.00Supply, delivery and storage at site Bourdon type pressure & compound gauges, 150 mm dia cast Aluminium Dial with , SS internal, DN 15 GI impulse line with three way cock. | ||||||
| 8.01 | Pressure Guages (0 - 10 kg/cm2) | 3 | Nos. | 6,130 ₹18,390 | 6,200 ₹18,600 | 6,000 ₹18,000 |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
15 Feb 2023, 2:30 pmClosed
EXECUTIVE ENGINEER, MALDA MECHANICAL DIVISION, PHE
Office of the Executive Engineer, Malda Mechanical Division, PHE Dte. Doulatpur PHE complex, P.O. Maliha, Dist. Malda, PIN 732102
Supply, installation, commissioning and trial operation of Electro-Mechanical and instrumentation components at newly constructed CWR under Narayanpur Distribution Zone within Malda Arsenic Area Water Supply Scheme (Southern Sector) under MLMD PHED
2023_PHED_456359_2
WBPHED/EE/MLMD/NIeT_29 of 2022-2023
Open Tender
Electrical Work/ Equipment
180 days
Doulatpur PHE Complex, P.O. Maliha, Dist. Malda
Please refer Tender documents.
6 documents required · 6 mandatory
₹1.3 L
Yes
10 Apr 2026
30 Jan 2023
17 Feb 2023
30 Jan 2023
15 Feb 2023
30 Jan 2023
stage.html
html • 0.05 MB
technical_918871.pdf
techsummary_918871.pdf
finance_918871.pdf
BOQ Comparative Chart
xlsx
finsummary_918871.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.27 MB
Tendernotice_2.pdf
PDF • 0.51 MB
Tendernotice_3.pdf
PDF • 4.74 MB
BOQ_918871.xls
BOQ • 0.26 MB
Technicalspec.pdf
Tender Documents • 13.13 MB
Download all tender documents and submit your bid