| 1 | L1₹7.5 LAccepted-Finance ERIKKADU THERMAL POST METTUR DAM 636 406 | METTUR DAM | SALEM | TAMIL NADU | 636406 | L1 | Accepted-Finance L1 Tender consider for Evaluation | |
| 2 | L2₹7.7 L+₹18,700 (2.49%)Accepted-Finance | L2 | Accepted-Finance L2 Tender not consider for Evaluation |
Tender Value
₹9.0 L
EMD Value
₹9,000
Closing Date
29 Jul 2020, 2:00 pmClosed
SE/Civil/MTPS-II
SE/Civil/MTPS-II
Construction of one number storage water tank for earth pits and emergency situations in 110KV, 230KV 400KV yard area at K.R.Thoppur.
2020_EB_170298_2
SE/Civil/MTPS-II/OT-29/2020-21
Open Tender
Civil Works - Others
Works
90 days
MTPS-II/Mettur Dam.
Tender Specification
2 documents required · 2 mandatory
₹0
₹9,000
Yes
3 Aug 2020
17 Jul 2020
30 Jul 2020
17 Jul 2020
29 Jul 2020
17 Jul 2020
Amount
Dismantling of existing Water line / Sewer line of various sizes carefully for rerooting the same as directed by the Engineer in charge including all labour charges, lead, lift, T&Ps etc., complete.
Earth work excavation for foundation and depositing on bank with initial lead of 10m & initial lift of 2m as directed by the Engineer in charge including all labour charges, lead, lift, T&Ps etc., complete.
Refilling with excavated earth well-watered and consolidated in layers of not more than 150mm thick in foundation and basement as directed by the Engineer in charge including all labour charges, lead, lift, T&Ps etc., complete.
Supplying and filling river sand / M sand well watered and consolidated in foundation in layers complying with standard specification as directed by the Engineer in charge including cost of all materials, all labour charges, lead, lift, T&Ps etc., complete.
Providing P.C.C. 1:4:8 using 40mm HBG metal for foundation as directed by the Engineer in charge including cost of all materials, labour charges, curing, T&P, laed, lift etc., complete.
Providing RCC 1:1.5:3 mix for footing and Plinth Beam using 12mm to 20mm graded HBG metal with minimum cement content of 300kg/m³ and maximum water-cement ratio of 0.5 and using anti-corrosive admixture ‘CONCARE’ or equivalent as directed by the Engineer in charge including cost of form work, centering and shuttering, cost of all materials, labour charges, vibrating the concrete, curing, all T&P, lead, lift, etc., complete but excluding cost of steel reinforcement. a) For Footing
Providing RCC 1:1.5:3 mix for footing and Plinth Beam using 12mm to 20mm graded HBG metal with minimum cement content of 300kg/m³ and maximum water-cement ratio of 0.5 and using anti-corrosive admixture ‘CONCARE’ or equivalent as directed by the Engineer in charge including cost of form work, centering and shuttering, cost of all materials, labour charges, vibrating the concrete, curing, all T&P, lead, lift, etc., complete but excluding cost of steel reinforcement. b) Plinth Beam
Providing RCC 1:1.5:3 mix for columns using 12mm to 20mm graded HBG metal with minimum cement content of 300kg/m³ and maximum water-cement ratio of 0.5 as directed by the Engineer in charge including cost of form work, centering and shuttering, cost of all materials, labour charges, vibrating the concrete, curing, all T&P, lead, lift, etc., complete but excluding cost of steel reinforcement.
Providing RCC Floor/Roof slab. Waist slab, Landing and steps in M25 Grade using 12mm to 20mm graded HBG metal with minimum cement content of 300kg/m³ and maximum water-cement ratio of 0.5 and using anti-corrosive admixture ‘CONCARE’ or equivalent as directed by the Engineer in charge including cost of form work, centering and shuttering, cost of all materials, labour charges, vibrating the concrete, curing , all T&P, lead, lift etc., complete but excluding cost of steel reinforcement.
Providing steel reinforcement of High Strength deformed TMT bars having charactoreristic strength of 500 N/mm2 of 'SAIL' or 'TATA' make or equilent for all RCC works including cutting, bending, binding, tying and placing in position as directed by the Engineer in charge including cost of steel, 18guage GI binding wire, lead, lift,T&Ps, etc.,
Plastering in CM 1:3, 20mm thick with water proof admixture of approved make and quality and bitumen paint wherever required and as directed by the Engineer in charge for inside and outside surfaces of water tank including cost of all materials, scaffolding charges, labour charges, curing, lead, lift, T&P, etc., complete.
Providing, fabricating and fixing in postion MS rungs as directed by the Engineer in charge including cost of fabrication, fixing in walls rigidly, cost of all materials, labour charges, lead, lift, T&P, two coat of painting, etc., complete.
Colour washing with two coats of cement paint over a coat of white cement over the brick wall as directed by the Engineer in charge including cost of all materials, labour charges, lead, lift, etc., complete.
Water tank walls with Joint free ceramic tiles of approved make, colour, pattern, quality and size over 10mm thick CM 1:3 bedding and pointing with same coloured cement in storage tank inside wall as directed by the Enginer incharge including cost of all materials, labour, lead, lift, curing etc., complete.
Providing plinth protection alround the storage tank and pump room by laying PCC 1:4:8 using 40mm HBG metal for an average thickness of 100mm and plastered over with CM 1:3, 20mm thick and the finished surface is to have a slope away from the plinth to drain as directed by the Engineer in charge including cost of all materials, labour charges, curing, lead, lift, etc., complete.
Providing PVC water bar 150mm wide with singlel bulb for wall / floor joint as directed by the Engineer incharge including cost of all materials, labour charges, lead, lift,T&Ps, etc., complete.
ARAVIND ASSOCIATES
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .