Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.3 LAdmitted-Finance | -52.80% | ₹7.3 L | L1 | Admitted-Finance |
| 2 | L2₹7.4 L+₹10,851.13 (1.48%)Admitted-Finance | -52.10% | ₹7.4 L+₹10,851.13 (1.48%) | L2 | Admitted-Finance |
| 3 | L3₹7.5 L+₹19,842.06 (2.71%)Admitted-Finance | -51.52% | ₹7.5 L+₹19,842.06 (2.71%) | L3 | Admitted-Finance |
| 4 | L4₹9.7 L+₹2.4 L (32.7%)Admitted-Finance | -37.35% | ₹9.7 L+₹2.4 L (32.7%) | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹15.5 L
EMD Value
₹31,000
Closing Date
16 Apr 2026, 12:00 pmClosed
XEN JMC Div II
Jammu
Upgradation of lane near H/o Sh. Anuj Raina 170/3 Shant Nagar to near H/o Sh. S P Vaid 204/3 Shant Nagar W No 35
2026_HAUDD_307624_4
eNIT01
Open Tender
Civil Works
Percentage
180 days
W No 35
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Yes
XEN JMC Div II
₹31,000
Yes
11 May 2026
9 Apr 2026
16 Apr 2026
9 Apr 2026
16 Apr 2026
9 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling manually/ mechanically including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge:
Bituminous road. | 793.19 | Sqm | 305.95 | ₹2,42,676.48 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 63.6 | Cum | 4,826.5 | ₹3,06,965.4 |
| 3 | Providing & Fixing of 60 mm thick paver tiles to be laid in cement mortar 1:4 mix & joints to be filled with cement mortar 1:3 mix (Complete Job). | 8,980 | Sft | 107 | ₹9,60,860 |
| 4 | Removal of Excavated mulba dismantled unserviceable material from the site of work by mech. Transport / Animal Transport or otherwise including loading complete job. | 58.29 | Cum | 183.58 | ₹10,700.88 |
| 5 | Providing and fixing of inauguration Plate complete job as per direction engineer-in charge. | 1 | No. | 5,000 | ₹5,000 |
| 6 | Carriage of materials by mechanical transport including loading / unloading & stacking complete.
• Stone aggregate below/above 40mm Nominal size Crushed for an average distance of 10 kms. | 85.86 | Cum | 279.04 | ₹23,958.37 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_997883.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .