Tender Value
₹5.1 L
Closing Date
16 Dec 2021, 6:00 pmClosed
Executive Engineer, REW, Doda.
Office of the Executive Engineer, REW, Doda.
Constt of Toilet Complex near jamia Masjid Busstand Gowari Panchayat Gowari Block Changa (PRIs Grant)
2021_RDPR_151271_79
e-NIT No 33/Capex of REW Doda 2021-22 DT 01-12-21
Open Tender
Civil Works
Item Rate
45 days
DODA
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer, REW, Doda.
Exempted
24 Dec 2021
7 Dec 2021
17 Dec 2021
7 Dec 2021
16 Dec 2021
7 Dec 2021
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil :
Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) including carriage of material all complete
Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc. including carriage of material all complete
Centering and shuttering including strutting, propping etc. and removal of form for: Edges of slabs and breaks in floors and walls Under 20 cm wide including carriage of material all complete
Providing and laying upto floor v level reinforced cement concrete in kerbs, steps and the like including curing but excluding the cost of centering, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) including carriage of material all complete
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Mild steel and medium tensile steel bars including carriage of material all complete
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) including carriage of material all complete (Quantity including 40 % of Boulders)
DB stone filling and HP Behind R/Wall
15mm Cement plaster on the rough side of single or half brick wall of mix: 1 : 4 ( 1 cement : 4 fine sand) including carriage of material all complete
15mm Cement plaster on the rough side of single or half brick wall of mix: 1 : 6 ( 1 cement : 6 fine sand) including carriage of material all complete
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) including carriage of material all complete
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate. including carriage of material all complete
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately): Second class kail wood including carriage of material all complete
Providing and fixing glazed shutters for doors, windows and clerestory windows using 4mm thick float glass panes including ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws. Second class Kail wood including carriage of material all complete
Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone including carriage of material all complete
Providing and fixing Ist quality ceramic glazed wall tiles conforming to IS : 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados over 12 mm thick bed of cement mortar 1:3 ( 1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3 kg per sqm, including pointing in white cement mixed with pigment of matching shade complete. including carriage of material all complete
Providing and fixing 1st quality ceramic glazed floor tiles conforming toIS : 15622 (thickness to be specified by the manufacturer ) of approved make in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge in skirting, risers of steps and dados over 12 mm thick bed of cement Mortar 1:3 (1 cement: 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm including pointing in white cement mixed with pigment of matching shade complete. including carriage of material all complete
CIB (citizen information Board ) size 4'00"x5'00"x0'9" (above plinth level) with tepered top having 20 degree slope in Brick Masonary(1:4) including plaster , paint, lettering and logos as per instruction of Engineer -in-charge including carriage of material. ( complete job)
Barkat Ali Batt
sager hussain
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .