Tender Value
₹66.5 L
EMD Value
₹1.3 L
Closing Date
10 Jul 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
WORKS
16 conditions · 4 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or V whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. As detailed in Para 10.2 of Tender Form (Second sheet) of Part 1 of attached GCC-2022.
The tenderer shall submit certificates regarding status of firm i.e. sole proprietorship, partnership, Company, Society/Trust etc. and should submit supporting documents e.g. notarized affidavit, MOA/AOA, Certificate of Incorporation, Partnership deed, power of attorney etc. (as applicable) to comply Para no. 10, 14, 15, 16 & 18 of Tender Form (Second Sheet) of Part I of attached GCC-2022.
The contractor should have a valid Electrical contractor license issued by Govt. and submit along with tender documents. If tenderer fails to submit a valid electrical contractor license, then offer from the tenderer will be summarily rejected.
13 conditions
Tender document and all the uploaded supporting documents must be digitally signed by the authorized signatory for tender, in token of their acceptance.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
OHE work in connection with proposed Platform raising (PF-1, 2) of KAWT, KHRA, BAGA, MADA, JILO, APJ, KMNP station; Platform Extension at KAWT, SMPR station and Foot Over Bridge (6 mtr wide) at DBLA, KAWT station in RPC Section of Jaipur Division.
GSU-EL-TRD-JP-25-26-5R-4
GSU-EL-TRD-JP-25-26-5R-4
Open
Works - General
9 Months
Jaipur, Rajasthan
₹0
₹1.3 L
10 Jul 2026
12 Jun 2026
26 Jun 2026
20 items across 1 schedule · ₹6,57,997.95 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Erection, testing & commissioning of rolled or fabricated and galvanized steel for traction mast, TTC, Portals (boom & uprights), AT masts, feeder mast, super-masts, bridge masts, steel gantries, supporting structures, Drop arm, SPS etc | MT 19.00 | — | 10,588.88 | 2,01,188.72 |
| 2 | Erection, testing & commissioning of material for complete Guy rod assembly as per latest RDSO drg., spec & explanatory notes | Numbers 3.00 | — | 1,782.53 | 5,347.59 |
| 3 | Erection, testing & commissioning of material for complete Single bracket assembly including ST, BT Insulators as per latest RDSO drg., spec & explanatory notes | Numbers 25.00 | — | 2,424.64 | 60,616 |
| 4 | Erection, testing & commissioning of material for complete regulated equipment (3 pulley type) with counter weight assembly for Regulated OHE tension as per latest RDSO drg., spec & explanatory notes | Numbers 1.00 | — | 6,869.48 | 6,869.48 |
| 5 | Erection, testing & commissioning of material for complete termination of Double conductor of overhead equipment with 9-ton insulators as per latest RDSO drg., spec & explanatory notes | Numbers 1.00 | — | 2,433.75 | 2,433.75 |
| 6 | Erection, testing & commissioning of material for complete termination of Single conductor of overhead equipment with 9-ton insulators as per latest RDSO drg., spec & explanatory notes | Numbers 1.00 | — | 1,319.93 | 1,319.93 |
| 7 | Erection, testing & commissioning of material for complete anticreep with galvanized steel wire including cut-in insulators and complete termination as per latest RDSO drg., spec & explanatory notes. | Numbers 1.00 | — | 4,371.23 | 4,371.23 |
| 8 | Erection, testing & commissioning of material for New dropper & re-adjustment of dropper | Each 18.00 Span | — | 510.71 | 9,192.78 |
| 9 | Erection, testing & commissioning of material for Large span wire (130sqmm) | Metre 100.00 | — | 25.88 | 2,588 |
| 10 | Erection, testing & commissioning of material for Ending clamp for Large span wire (130 sqmm) | Numbers 1.00 | — | 109.26 | 109.26 |
| 11 | Provision (Supply, Erection, testing & commissioning of material) of False Catenary under FOB/ROB as per latest RDSO drg., spec & explanatory notes | Numbers 6.00 | — | 32,400.7 | 1,94,404.2 |
| 12 | Erection, testing & commissioning of material for 160 Sqmm Large Copper Jumper assembly | Metre 20.00 | — | 555.75 | 11,115 |
| 13 | Erection, testing & commissioning of material complete for single pole isolator without earth assembly with post insulators as per latest RDSO drg., spec & explanatory notes | Numbers 1.00 | — | 4,728.22 | 4,728.22 |
| 14 | Dismantling of existing complete anti-creep assemblies with anti-creep wire, insulators, adjusters etc, and transportation to TRD Depot | Numbers 1.00 | — | 2,013.63 | 2,013.63 |
| 15 | Dismantling of existing cantilever assembly | Numbers 24.00 | — | 1,512.56 | 36,301.44 |
| 16 | Dismantling of ATD (Regulating equipment) with counter weights. | Numbers 1.00 | — | 8,335.76 | 8,335.76 |
| 17 | Dismantling of guy rod with termination | Numbers 3.00 | — | 1,331.46 | 3,994.38 |
| 18 | Dismantling of Portal, fabricated steel other than Mast/Upright | MT 9.00 | — | 9,518.11 | 85,662.99 |
| 19 | Dismantling of Mast / Upright by gas cutting | Numbers 10.00 | — | 1,274.38 | 12,743.8 |
| 20 | Dismantling & removal of isolator complete | Numbers 1.00 | — | 4,661.79 | 4,661.79 |
| Schedule total | ₹6,57,997.95 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC_April-2022.pdf
ATTACHMENT
CorrectionSlipsupto11-GCCApr2022.pdf
ATTACHMENT
Special Condition of Contract
ATTACHMENT
2025-11-10SpecialconditionofcontractKAWTKHRABAGMADAJILOAPJ3.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .