Tender Value
₹94.3 Cr
EMD Value
₹1.9 Cr
Closing Date
3 Nov 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
DYCECMRJ
14 conditions · 3 needing a document upload
Clause 10.2 and for tenderer participating as JV firm Clause 17.15.2 of TENDER FORM (Second Sheet) of GCC April, 2022 of Tender Document
Definition of Similar Nature of work to be read as under: "Any Civil Engineering Work ." (Ref. E-Office Computer No. 580636)
Clause 10.1 & and for tenderer participating as JV firm Clause 17.15.1 of TENDER FORM (Second Sheet) of GCC APRIL 2022 & Clause of SPECIAL CONDITIONS OF CONTRACT (PART-I) (SCC) of this document).
9 conditions · 3 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Scope of work as per Tender document
The advance correction slip to relevant clauses are applicable and part of the tender document. Hence, tenderer require to look into the correction slips before submitting tender.
Completion Period : 8 months & Maintenance Period : 6 months
Balance Earthwork in section II from Km.46.000 to Km.64.000 (including New Baramati Yard & excluding Km 49-Km 50.1) and Balance portion of Malwadi Yard and other locations in Phaltan-Katphal new line section in connection with Lonand- Baramati via Phaltan New BG Line Project
DYCECSTR_2026_02~CR
DYCECSTR_2026_02
Open
Works - General
8 Months
Sangli, Maharashtra
₹0
₹1.9 Cr
7 Oct 2026
7 Oct 2026
20 Oct 2026
24 items across 2 schedules · ₹17,42,06,987.44 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | In all conditions and classifications of soil except rock | cum | 160000.00 | 98.7 | 1,57,92,000 |
| 2 | Soft rock not requiring blasting | cum | 500.00 | 238.57 | 1,19,285 |
| 3 | Mechanical manufacturing of blanketing material by using only hard and durable stone crushed in mechanical crusher to different gradations, wet mixing of the same in designed proportion in Pug mill or wet mix plant to have uniform gradation including all incidental transportation, laying over finished formation in uniform layer(s) with motor grader, compaction with suitable vibratory roller to specified density and finishing to correct profile, complete as per RDSO Specification No. RDSO/2020/GE: IRS-0004 w ith latest correction slips. Note: This item shall be used only when entire constituent of blanketing material is mechanically manufactured by crushing of hard and durable stone into desired gradation of designed proportion. | cum | 38542.00 | 1,842.52 | 7,10,14,405.84 |
| 4 | With 3 horizontal bamboo / balli members of minimum 50mm dia. spaced equally | RM | 1000.00 | 144.87 | 1,44,870 |
| 5 | Joining with strong nylon rope in one cross and one horizontal pattern of minimum 5mm dia. | RM | 1000.00 | 86.66 | 86,660 |
| 6 | Plate size 30cm x 30cm | Each | 34.00 | 21,711.08 | 7,38,176.72 |
| 7 | Conducting in situ Vane shear test for soil as per IS:4434 | Each | 50.00 | 2,797.51 | 1,39,875.5 |
| 8 | Conducting SCPT for soil as per IS:4968 | Each | 50.00 | 4,257.08 | 2,12,854 |
| 9 | Conducting DCPT for soil as per IS:4968 | Each | 50.00 | 4,257.08 | 2,12,854 |
| 10 | Conducting determination California Bearing Ratio as per IS:2720 | Each | 400.00 | 1,410.92 | 5,64,368 |
| 11 | From Truck / Trailer | MT | 100.00 | 86.59 | 8,659 |
| 12 | Fixing vertically the unserviceable PSC sleepers at locations of tress-passing, railway boundary or to make temporary store by excavating trench, fixing PSC sleeper in trench and filling back open trench. | Each | 50.00 | 156.47 | 7,823.5 |
| 13 | Providing and fixing Trolley Refuge of size 3.0m x3.0m on cess, placing with released unserviceable PSC sleepers and keeping them at all four sides of refuge and also placing as matting inside the refuge by keeping them in upside down position with a minimum of 14 sleepers including levelling with earth, excavation, all lead and lift, crossing of tracks, leading the sleepers with in a free lead and lift, handling etc., with all contractor's men material complete and as directed by the Engineer-in-charge. Note: Earth-work will to be paid separately under relevant item. | Each | 63.00 | 4,135.77 | 2,60,553.51 |
| 14 | JCB Backhoe Loaders 3DX Plus or similar with minimum 1.10 cum bucket capacity | Hour | 200.00 | 752.64 | 1,50,528 |
| 15 | Hydra or similar tyre mounted Pick-n-Carry crane of 12T capacity for misc. works of handling of material | Hour | 50.00 | 889.42 | 44,471 |
| 16 | Tractor with Trolley for local transportation or other misc. works. | Hour | 500.00 | 199.17 | 99,585 |
| Schedule total | ₹8,95,96,969.07 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Tender_Document_Balance_EW_LNN_BRMT.pdf Tender Document Balance EW LNN BRMT
ATTACHMENT
Tender_Document_Balance_EW_LNN_BRMT.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .