| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAdmitted-Finance HURA HURA HURA DIST PURULIA W B PIN 723130 | PURULIA | WEST BENGAL | 723130 | ₹2.3 L | L1 | Admitted-Finance |
| 2 | L2₹2.3 LAdmitted-Finance | ₹2.3 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | DUTTA CONSTRUCTION L1 | SURAJ CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 1 | Cum | 1,000 ₹1,000 | 1,100 ₹1,100 |
| 2.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 9 | Cum | 300 ₹2,700 | 350 ₹3,150 |
| 3.00 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 0.25 | Cum | 860 ₹215 | 870 ₹217.50 |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-lll) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources). | 1.3 | Cum | 9,000 ₹11,700 | 9,100 ₹11,830 |
| 5.00 | Centering & shuttering including strutting, propping etc & removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 7 | Sqm | 400 ₹2,800 | 450 ₹3,150 |
| 6.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.2 | Cum | 9,200 ₹11,040 | 9,300 ₹11,160 |
| 7.00 | Reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete.Thermo-Mechanically Treated bars. | 70 | Kg | 130 ₹9,100 | 135 ₹9,450 |
| 8.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 7 | Cum | 290 ₹2,030 | 300 ₹2,100 |
| 9.00 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 110 | Kg | 175 ₹19,250 | 177 ₹19,470 |
| 10.00 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes. | 900 | Kg | 175 ₹1.6 L | 177 ₹1.6 L |
Tender Value
₹2.3 L
EMD Value
₹4,532
Closing Date
20 Mar 2026, 2:30 pmClosed
DIRECTOR, CSIR-CMERI
CSIR-CMERI, M. G Avenue, Durgapur 713209, West Bengal
Making a temporary shed for Hyperbaric Chamber beside the URAS Group at CSIR-CMERI Institute campus, Durgapur-09
2026_CSIR_270013_1
42/782/25-26/CI/Maint/ESD
Open Tender
Civil Works
45 days
CSIR-CMERI INSTITUTE, DURGAPUR
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
DIRECTOR, CSIR-CMERI
₹4,532
13 Apr 2026
10 Mar 2026
23 Mar 2026
10 Mar 2026
20 Mar 2026
10 Mar 2026
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-lll) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources).
Centering & shuttering including strutting, propping etc & removal of form for Foundations, footings, bases of columns, etc. for mass concrete
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete.Thermo-Mechanically Treated bars.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift.
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes.
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : One or more coats on old work
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
ConDocHyperbaric.pdf
Tender Documents • 15.89 MB
TenderAcceptenceUndertaking.pdf
Other Document • 0.80 MB
BOQ_314704.xls
BOQ • 0.34 MB
ScopeandMakeshedforhyperbaricchamber.pdf
Additional Documents • 0.40 MB
Download all tender documents and submit your bid