Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹16.6 L
EMD Value
₹16,590
Closing Date
23 Apr 2025, 3:00 pmClosed
THE BLOCK DEVELOPMENT OFFICER VP UTHUKULI
THE BLOCK DEVELOPMENT OFFICER VP UTHUKULI PANCHAYAT UNION UTHUKULI RS TIRUPPUR DISTRICT
Agri Godown
2025_RDTN_547393_1
TNRD_UKL_MUTHAMPLM_07
Open Tender
Civil Works - Buildings
Item Rate
Uthukuli
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹16,590
23 Apr 2025
17 Apr 2025
23 Apr 2025
17 Apr 2025
23 Apr 2025
17 Apr 2025
Amount
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Filling with excavated earth including all labour charges as per standard specification.
Supplying & Erecting centering for sides & soffits including necessary supports & strutting up to 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casuarinas props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for the following itemsCentering for Below ground level
Centering for column
Slab Centering
Sunshade
Supplying and Fabrication Steel rainforcement including all cost and conveyance etc complete
RCC 1:1.5:3 mix using 20mm HBG ISS Metal including all cost and conveyance etc complete
Fly ash Brick work in CM 1:5 mix using fly ash bricks of size 23x11x7 cm for the following including curing etc., complete complying with standard specifications
Weathering course with brick jelly lime concrete using 20mm brick jelly with pure slacked lime over R.C.C. roof slab in the proportion of 32:12.5 and charges for mixing , laying ,and finishing etc complete
Finshing the top of roof with one course of pressed tiles of size 23x23x2cm with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc complete
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete). The Putty should be got approved by the Executive Engineer
Distempering two coats over NEW Plastered surface using Oil Bound Distemper including cost and all Labour charges etc., complete
Painting two coats over NEW Plastered surface using Approved Quality of Exterior Emulsion Paint including cost and all Labour charges etc., complete
Painting two coats over New Iron works such as doors windos, etc., with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with standard Spe
Supply and fixing of Rolling shutters Including cost and conveyance etc complete
Supplying and fixing Steel glazed ventilators with side hung swing shutter outer frame and shutter frames
Name board
Provision for Photographic charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
SRI MAHALAKSHMI BLUEMETALS AND CONSTRUCTIONS (BID ID -1315376)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .