| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance AT SANTRILOCHAMPUR PO BAIDYARAJPUR DIST JAJPUR PIN 755007 | BAIDYARAJPUR | JAJPUR | ODISHA | 755007 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance AT KALIDASPUR PO BALIMED PS NAIKANIDIHI DIST BHADRAK PIN 756131 | BHADRAK | ODISHA | 756131 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹25.0 L
EMD Value
₹25,500
Closing Date
19 May 2026, 5:00 pmClosed
SE Dhenkanal R and B Division
SE Dhenkanal R and B Division
Renovation Such as Repair to student canteen room, staff dining room and construction of cycle stand, DG Shed, Paver path behind MMCC room at Govt. ITI at Dhenkanal
2026_EICCL_128891_1
SE DKL (R and B) 03/2026-27
Open Tender
Civil Works - Buildings
Percentage
60 days
Dhenkanal
Please refer tender documents
2 documents required · 2 mandatory
₹6,000
₹25,500
Yes
27 Jul 2026
6 May 2026
20 May 2026
6 May 2026
19 May 2026
6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches in HARD soil up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site with all leads and lifts, T&P labour required for the work etc. complete as directed by the Engineer-In Charge. | 47.03 | Cum. | 276.89 | ₹13,022.14 |
| 2 | Supplying and filling in foundation and plinth with sand including well watering, ramming, including cost, conveyance and royalities of all materials and cost of all labour with T&P required for the work etc. complete as per direction of Engineer-In-Charge. | 65.86 | Cum. | 700.06 | ₹46,105.95 |
| 3 | Cement concrete (1:3:6) in foundation and plinth using 4 cm. size hard granite crusher broken metal of approved quarry and approved quality including hoisting lowering laying concrete in layers not exceeding 0.15 M. in depth including compacting watering and curing etc, complete including cost ,conveyance, royalities & of all materials and cost of labour etc with T&P required for the work etc. complete as per specification & direction of Engineer-In-Charge. | 34.12 | Cum. | 6,136.84 | ₹2,09,388.98 |
| 4RCC work M-20 having a minimum compressive strength 200kgs/cm2 in 15cm.cubes at 28 days after mixing and tests conducted in accordance with IS.456 and IS.516 using 12mm.to 20mm. size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering laying and compact concrete by using vibrator watering and curing for 28 days centering shuttering and finishing the exposed surface smooth providing grooves or beads where necessary including cost, conveyance ,royalities & testing of all materials and cost of all labour with T&P required for the work etc. complete in all respect as per specification & direction of E.I.C.(but excluding cost of M.S Rod or Tor Steel & binding wires) | |||||
| 4.1 | Column Base Footing | 10.51 | Cum. | 6,552.8 | ₹68,869.93 |
| 4.2 | Column Super-Structure | 7.42 | Cum. | 15,815.71 | ₹1,17,352.57 |
| 4.3 | Plinth Band | 5.2 | Cum. | 7,423.15 | ₹38,600.38 |
| 4.4 | Roof Beam | 3.63 | Cum. | 15,815.71 | ₹57,411.03 |
| 4.5 | Roof Slab | 12.55 | Cum. | 13,800.75 | ₹1,73,199.41 |
| 5 | Cutting straightening HYSD Bars/High tensile tor steels, confirming to FE -500 grade bending binding welding and jointing if necessary and tying the grills and placing in position as required for RCC work and for providing fan hooks hoisting lowering and laying including cost, conveyance of HYSD bars/High tensile tor steels and binding wires of 18 to 20 gauge and labour required for the work for bending binding and tying the grills in all floors etc. complete as per direction of E.I.C(Measurement will be taken excluding cost of binding wire)and payment will be made on the weight of M.S or tor steel only). | 48.29 | Qntl. | 9,238.96 | ₹4,46,149.38 |
stage.html
html • 0.15 MB
finance_589947.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.23 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
DTCN_ITI.pdf
Tender Documents • 0.80 MB
BOQ_589947.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .