| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Finance | -1.10% | ₹2.4 L | L1 | Admitted-Finance |
| 2 | L2₹2.4 L+₹5,083.68 (2.12%)Admitted-Finance | +1.00% | ₹2.4 L+₹5,083.68 (2.12%) | L2 | Admitted-Finance |
| 3 | L3₹2.5 L+₹7,504.48 (3.13%)Admitted-Finance | +2.00% | ₹2.5 L+₹7,504.48 (3.13%) | L3 | Admitted-Finance |
Tender Value
₹2.4 L
EMD Value
₹4,840
Closing Date
22 Aug 2026, 6:00 pmClosed
Executive Engineer REW Jammu
Executive Engineer REW Jammu
Construction of bartan safai tank at Sultanpur near Kanjak Devsthan Pyt. Sehora B Block Bishnah under PRI Capex for the Financial year 2026-2027.
2026_RDPR_320312_7
e-NIT No.385 -REWJ of 2026 dated. 08-08-2026
Open Tender
Civil Works
Percentage
45 days
Executive engineer REW Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹4,840
15 Sept 2026
10 Aug 2026
24 Aug 2026
10 Aug 2026
22 Aug 2026
10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour engaged for general site clearance. | 4 | No. | 553 | ₹2,212 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : | 0.91 | cum | 479.3 | ₹436.16 |
| 3 | Providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level | 1.37 | cum | 4,826.5 | ₹6,612.31 |
| 4 | CEMENT CONCRETE (CAST-IN-SITU) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 2.04 | cum | 5,733.6 | ₹11,696.54 |
| 5 | CEMENT CONCRETE (CAST-IN-SITU) Providing and laying in position reinforced cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.55 | cum | 5,733.6 | ₹14,620.68 |
| 6 | Cement concrete flooring 1:2:4 finished with a floating coat of neat cement slurry and curing complete 40 mm thick with 20 mm nominal size aggregate | 5.02 | sqm | 510.25 | ₹2,561.46 |
| 7 | Brick work with common burnt clay(non modular)brick of class designation 7.5 in foundation and plinth including curing ,in cement mortar 1:6 (1 cement : 6 coarse sand ) | 6.92 | cum | 7,571.55 | ₹52,395.13 |
| 8 | FORM WORK Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns etc. for mass concrete. | 21.93 | sqm | 718.2 | ₹15,750.13 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level | 203.91 | kg | 123.2 | ₹25,121.71 |
| 10 | 12 mm thick cement plaster in 1:6 cement mortar | 44.98 | sqm | 266.2 | ₹11,973.68 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
BOQ_1064551.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .