| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.4 L
EMD Value
₹1,400
Closing Date
23 Nov 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ZONAL OFFICER-3
Greater Chennai Corporation Aminity Buildng, CMDA Truck Terminal Madhavaram,Chennai-600060
Under Councillor Fund Budget Year - 2026-27 RAISING OF WEIR WALL IN MADHAVARAM LAKE AT KAMARAJAR SALAI IN DIVISION-27, UNIT-07, ZONE-03
2026_CoC_724153_1
Z.O.III.C.NO.E1/7153/2026
Open Tender
Civil Works
Works
120 days
CHENNAI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1,400
24 Nov 2026
7 Nov 2026
23 Nov 2026
7 Nov 2026
23 Nov 2026
7 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Conveyance by roads in plains 0 to 10 km including Loading unloading and transportation charges | 2 | CUM | 225 | ₹450 |
| 2 | Supplying, fabricating and placing in position Ribbed Tor Steel / TMT reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) Above plinth / Basement level | 178 | KGS | 98.7 | ₹17,568.6 |
| 3 | Supplying and erecting centering for plane surfaces such as RCC Floor/Roof Beam, Lintels, Cantilever Beams, Bed Blocks etc.. with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over Steel adjustable Span of Size 2m x 2m(expandable upto 3.60m) and Silver Oak Joists of Size 10 x 5 cm spaced at 50cm to 60cm c/c and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) Spaced at not more than 50 to 60cm c/c , etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid).BEAM | 21 | SQM | 1,178.29 | ₹24,744.09 |
| 4 | Providing and laying in position, Standardised Concrete Mix M-30 Grade using In-situ Concrete batching plant/ Ready Mix Concrete (RMC) adopting weigh batch method in accordance with IS:456-2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 400 kg/m3 and maximum water cement ratio of 0.45, including admixture (plasticiser / superplasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5.0 Cu.m) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 Cu.m) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m’) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including Conveyance of concrete from batching plant to Work site, Electricity charges and other works & labour cost involved for concrete production, laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No separate payment will be made by the Department for the excess usage of materials). | 7 | CUM | 8,529.2 | ₹59,704.4 |
| 5 | Dismantling RCC by manual / by using deploying machineries | 2 | CUM | 4,610.31 | ₹9,220.62 |
| 6 | Material Supply and fabrication of Rain water barrier including painting and transport at Sasthri Nagar | 1 | LS | 24,000 | ₹24,000 |
stage.html
html • 0.02 MB
finance_869339.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
7153.pdf
Tender Documents • 1.61 MB
BOQ_869339.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .