Loading…
Loading…
Tender Value
₹16 L
EMD Value
₹32,000
Closing Date
1 Oct 2026, 3:00 pm4d left
Superintending Engineer
F-3 Administrative Complex Building MPPTCL Bijli Nagar Colony Govindpura Bhopal
Construction of Ladies Toilet and Other works for AE TLM Sub Division at Bhopal Harda Itarsi Sarni Sehore Shujalpur and Vidisha
2026_MPPTC_523282_1
TS-73/476
Open Tender
Civil Works - Others
Percentage
Bhopal Harda Itarsi Sarni Sehore Shujalpur Vidish
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,180
₹32,000
1 Oct 2026
22 Jul 2026
5 Oct 2026
22 Jul 2026
1 Oct 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m. All kinds of soil. (M2 : 100 sqm) | 28 | 100 sqm | 803 | ₹22,484 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including dressing of sides and ramming of bottom disposal of excavated earth, lead up to 50m and lift up to 1.5m, disposed earth to be levelled and neatly dressed. (No extra lift is payable if work is done by mechanical means) All kinds of soil | 66.38 | cum | 147 | ₹9,757.86 |
| 3 | Providing and laying in position cement concrete of With 40mm nominal size graded stone aggregate. M-7.5 Nominal Mix -1 Cement : 4 sand : 8 graded stone aggregate | 10.95 | cum | 3,474 | ₹38,040.3 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete :..M-20 Grade Concrete | 16.4 | cum | 6,153 | ₹1,00,909.2 |
| 5 | Reinforced cement concrete work (with 20 mm nominal size graded stone aggregate) …..M-20 Grade Concrete | 13.24 | cum | 6,231 | ₹82,498.44 |
| 6 | Reinforcement for R.C.C. work including straightening, ..TMT BARS | 2,235 | kg | 80 | ₹1,78,800 |
| 7 | Centering and shuttering in cluding strutting, propping etc. and removal of form for:..Foundations, footings, bases of columns, etc. for concrete upto plinth level | 63.56 | sqm | 190.6 | ₹12,114.54 |
| 8 | Centering and shuttering in cluding strutting, propping etc. and removal of form for:... etc...Uptoplinthlevel | 120.68 | sqm | 219 | ₹26,428.92 |
| 9 | Centering and shuttering in cluding strutting, propping etc. and removal of form for:..Lintels, beams, girders, bressumers and cantilevers | 3.36 | sqm | 356 | ₹1,196.16 |
| 10 | Centering and shuttering in cluding strutting, propping etc. and removal of form for:..Columns, P i l l a rs , Piers, Abutments, Posts and Struts. | 63.68 | sqm | 417.2 | ₹26,567.3 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.30 MB
Tendernotice_2.pdf
PDF • 0.64 MB
SECTION2.pdf
Tender Documents • 1.18 MB
SECTION1.pdf
Tender Documents • 1.41 MB
Instructions.pdf
Other Document • 0.02 MB
BOQ_630207.xls
BOQ • 0.33 MB
Timeextenstion734764.pdf
PDF • 0.55 MB
TimeExtension764763.pdf
PDF • 0.54 MB
timeextension734762.pdf
PDF • 0.54 MB
timeextension734762.pdf
PDF • 0.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .