| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-AOC BINA ROAD PARASI P O KAKRI DISTT SONBHADRA UP | SONBHADRA | UP | ₹3.4 L Quoted ₹2.9 L | L1 | Accepted-AOC Awarded as per NIT |
| 2 | L2₹3.1 LRejected-Finance 521 UBI ROAD SINGRAULI SINGRAULI SINGRAULI MADHYA PRADESH 486889 UDYAM MP 11 0000528 23ABQPC9013J1ZP R M | SINGRAULI | MADHYA PRADESH | 486889 | ₹3.1 L | L2 | Rejected-Finance Emerged as L2 bidder |
| Sl No | Description | Qty | Unit | CHANDRA MOTOR REWINDING WORKS L1 | Sandeep and Co. L2 |
|---|---|---|---|---|---|
| 1.0003 Nos.HT Starters Sl no. ET 041,ET122,ET055 | |||||
| 1.01 | Indicating lamp | 9 | Nos. | 55 ₹495 | 60 ₹540 |
| 1.02 | Push button | 9 | Nos. | 100 ₹900 | 250 ₹2,250 |
| 1.03 | Ammeter | 3 | Nos. | 550 ₹1,650 | 750 ₹2,250 |
| 1.04 | Voltmeter | 1 | Nos. | 550 ₹550 | 750 ₹750 |
| 1.05 | IDMT overcurrent relay, 3P As per sample | 1 | Nos. | 18,000 ₹18,000 | 17,500 ₹17,500 |
| 1.06 | selector switch (voltmeter and Ammeter) | 4 | Nos. | 150 ₹600 | 150 ₹600 |
| 1.07 | Auxiliary contactor 110V AC | 9 | Nos. | 900 ₹8,100 | 800 ₹7,200 |
| 1.08 | copper control cable, single core, 2.5 sqmm | 300 | mtr | 30 ₹9,000 | 25 ₹7,500 |
| 1.09 | Supply and fixing of Digital Hour meter counter range from 1 sec to 9999999 Hrs | 3 | Nos. | 1,500 ₹4,500 | 1,500 ₹4,500 |
Updated dates
Tender Value
₹3.9 L
EMD Value
₹4,900
Closing Date
9 Mar 2026, 6:00 pmClosed
General Manager (EnM)
Office of the General Manager Khadia Area Sonbhadra 231222 (UP)
Repairing/ overhauling and testing of 07 Nos. of HT starters, 02 Nos of Field Switch at coal section(EandM), Khadia Project during monsoon 2026-27
2026_NCL_354066_1
KHD/EM/E-Tender/25-26/490 Date 21.02.2026
Open Tender
Electrical and Maintenance Works
45 days
Khadia Project
Please refer NIT
4 documents required · 4 mandatory
₹4,900
10 Apr 2026
21 Feb 2026
10 Mar 2026
21 Feb 2026
9 Mar 2026
22 Feb 2026
21 Feb 2026 - 28 Feb 2026
03 Nos.HT Starters Sl no. ET 041,ET122,ET055
Indicating lamp
Push button
Ammeter
Voltmeter
IDMT overcurrent relay, 3P As per sample
Auxiliary contactor 110V AC
copper control cable, single core, 2.5 sqmm
Supply and fixing of Digital Hour meter counter range from 1 sec to 9999999 Hrs
Overhauling checking and testing of Isolator mechanism with change of accessories as required
Single Phase Preventor(SPP)
Supply of Bridge Rectifier
Supply of Closing coil assembly 110V DC (as per sample)
Supply of tripping coil assembly 110V DC (as per sample)
Painting with syntetic enamel paint of approved brand and manufacture of requried colour to give an even shade (one or more coarts on old works)
Labour charges(dismantliing damaged parts, cleaning of starters, wiring with cable tie, tie base and copper lugs) and fixing of supply part and testing of starters CT,PT ratio,polarity test,checking and testing of relay (Note- if any other items or spares not includ ed in the BOQ are required for installation to complete the overhauling,items will be supplied by the department, and the contractor shall have to fit/install to complete repair/overhauling.)
Repairing of body, gates of starter and gate locking system and denting of body to bring it in original shape including all supply material and tools
02 Nos. HT Starter Sl no. SAHAT 2362,SAHAT 2363
Indicating lamp
Push button
Ammeter
Voltmeter
copper strip , 20X6mm
Auxiliary contactor 110V AC
copper control cable, single core, 2.5 sqmm
Overhauling checking and testing of Isolator mechanism with change of accessories as required
DC power pack
Single Phase Preventor(SPP)
Supply of Closing coil assembly 110V DC (as per sample)
Supply of tripping coil assembly 110V DC (as per sample)
Painting with syntetic enamel paint of approved brand and manufacture of requried colour to give an even shade (one or more coarts on old works)
Labour charges(dismantliing damaged parts, cleaning of starters, wiring with cable tie, tie base and copper lugs) and fixing of supply part and testing of starters CT,PT ratio,polarity test,checking and testing of relay (Note- if any other items or spares not included in the BOQ are required for installation to complete the overhauling,items will be supplied by the department, and the contractor shall have to fit/install to complete repair/overhauling.)
02 Nos HT starters sl.no .STR-512,STR-524
Indicating lamp
Push button
Ammeter
Voltmeter
IDMT overcurrent relay as per sample
copper control cable, single core, 2.5 sqmm
Supply and fixing of Digital Hour meter counter range from 1 sec to 9999999 Hrs
Earth leakage relay as per sample
DC power pack
Single Phase Preventor(SPP)
Supply of Fuse base and carrier with fuse
Supply of Closing coil assembly 110V DC (as per sample)
Painting with syntetic enamel paint of approved brand and manufacture of requried colour to give an even shade (one or more coarts on old works)
Labour charges(dismantliing damaged parts, cleaning of starters, wiring with cable tie, tie base and copper lugs) and fixing of supply part and testing of starters CT,PT ratio,polarity test,checking and testing of relay (Note- if any other items or spares not included in the BOQ are required for installation to complete the overhauling,items will be supplied by the department, and the contractor shall have to fit/install to complete repair/overhauling.)
02 Nos. HT Field switches Sl no. 200828, & 0369/33
Ammeter
Voltmeter
IDMT overcurrent relay as per sample
copper control cable, single core, 2.5 sqmm
Earth leakage relay as per sample
Overhauling checking and testing of Isolator mechanism with change of accessories as required
Supply of Bridge Rectifier
Supply of Fuse base and carrier with fuse
Supply of Closing coil assembly 110V DC (as per sample)
Supply of tripping coil assembly 110V DC (as per sample)
Painting with syntetic enamel paint of approved brand and manufacture of requried colour to give an even shade (one or more coarts on old works)
Labour charges(dismantliing damaged parts, cleaning of starters, wiring with cable tie, tie base and copper lugs) and fixing of supply part and testing of starters CT,PT ratio,polarity test,checking and testing of relay (Note- if any other items or spares not included in the BOQ are required for installation to complete the overhauling,items will be supplied by the department, and the contractor shall have to fit/install to complete repair/overhauling.)
Repairing of body, gates of starter and gate locking system and denting of body to bring it in original shape including all supply material and tools
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_366889.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.52 MB
BOQ_366889.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid