| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 CrAdmitted-Finance | ₹8.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹10.0 Cr+₹1.2 Cr (13.7%)Admitted-Finance 6 OM COMPLEX BHUJ BHACHAU BYPASS DABDA ROAD ANJAR KUTCH 370110 | ANJAR | KUTCH | GUJARAT | 370110 | ₹10.0 Cr+₹1.2 Cr (13.7%) | L2 | Admitted-Finance |
| 3 | L3₹10.5 Cr+₹1.7 Cr (19.4%)Admitted-Finance BYPASS ROAD ABADGANJ DALTONGANJ | ₹10.5 Cr+₹1.7 Cr (19.4%) | L3 | Admitted-Finance |
| 4 | L4₹10.9 Cr+₹2.1 Cr (23.8%)Admitted-Finance | ₹10.9 Cr+₹2.1 Cr (23.8%) | L4 | Admitted-Finance |
| 5 | L5₹11.1 Cr+₹2.3 Cr (26.2%)Admitted-Finance | ₹11.1 Cr+₹2.3 Cr (26.2%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S INDIAN ELECTRICAL SERVICES L3 | Ms Gupteshwar Construction L5 | KUMAR AND ROY CONSTRUCTION L6 | M/s Ray Construction L4 | VELJI RATNA SORATHIA INFRA PVT. LTD L2 | M/s SILDILIYA CONSTRUCTION L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Cutting of trees, excluding removal of stumps and roots of trees Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres.
Girth from 300mm to 600mm | 5 | Each | 640 ₹3,200 | 670 ₹3,350 | 700 ₹3,500 | 1,458 ₹7,290 | 100 ₹500 Lowest | 300 ₹1,500 |
| 2.00 | Dismantling of flexible pavements and disposal of dismantled materials upto a leadof 1000 metres, stacking serviceable and unserviceable materials separately By Mechanical means Bituminous courses | 651 | cum | 250 ₹1,62,750 | 255 ₹1,66,005 | 260 ₹1,69,260 | 68 ₹44,268 | 55 ₹35,805 Lowest | 120 ₹78,120 |
| 3.00 | Clearing and Grubbing road land Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness. By Mechanical means using dozer In area of light jungle | 2.39 | Hectare | 75,000 ₹1,78,950 | 97,000 ₹2,31,442 | 97,000 ₹2,31,442 | 248 ₹591.73 Lowest | 35,000 ₹83,510 | 50,000 ₹1,19,300 |
| 4.00 | Excavation in Soil using Hydraulic Excavator and Tippers with Disposal upto 1000 metres. Excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and tranporting to the embankment location within all lifts and lead upto 1000 m | 3,991.66 | cum | 68 ₹2,71,432.88 | 65 ₹2,59,457.9 | 70 ₹2,79,416.2 | 59 ₹2,35,507.94 | 55 ₹2,19,541.3 | 50 ₹1,99,583 Lowest |
| 5.00 | Construction of Embankment with Material obtained from Borrow pits. Construction of Embankment with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. | 10,739.35 | cum | 140 ₹15,03,509 | 140 ₹15,03,509 | 150 ₹16,10,902.5 | 100 ₹10,73,935 Lowest | 170 ₹18,25,689.5 | 100 ₹10,73,935 Lowest |
| 6.00 | Construction of Embankment with Material Deposited from Roadway Cutting. Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2. Rate per cum after adding royalty@Rs 27.48/cum | 3,592.49 | cum | 78 ₹2,80,214.22 | 65 ₹2,33,511.85 | 70 ₹2,51,474.3 | 78 ₹2,80,214.22 | 55 ₹1,97,586.95 | 50 ₹1,79,624.5 Lowest |
| 7.00 | Providing and laying pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Stone/Boulder | 358.16 | Cum | 2,000 ₹7,16,320 | 2,050 ₹7,34,228 | 2,000 ₹7,16,320 | 265 ₹94,912.4 Lowest | 1,750 ₹6,26,780 | 1,500 ₹5,37,240 |
| 8.00 | Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification | 179.08 | Cum | 2,500 ₹4,47,700 | 2,750 ₹4,92,470 | 2,800 ₹5,01,424 | 548 ₹98,135.84 Lowest | 1,750 ₹3,13,390 | 2,000 ₹3,58,160 |
| 9.00 | Construction of Subgrade and Earthen
Shoulders Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. | 7,107.27 | cum | 150 ₹10,66,090.5 | 140 ₹9,95,017.8 | 150 ₹10,66,090.5 | 1,800 ₹1,27,93,086 | 129 ₹9,16,837.83 | 110 ₹7,81,799.7 Lowest |
| 10.00 | By Mix in Place Method Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Rate per cum for grading-V Material | 3,646.18 | cum | 2,500 ₹91,15,450 | 2,250 ₹82,03,905 | 2,300 ₹83,86,214 | 1,541 ₹56,18,763.38 Lowest | 2,200 ₹80,21,596 | 1,800 ₹65,63,124 |
Tender Value
Refer Docs
EMD Value
₹10.2 L
Closing Date
29 May 2025, 12:00 pmClosed
EE RCD ROAD DIVISION DALTONGANJ
EE RCD ROAD DIVISION DALTONGANJ
Construction of Bridge/High Level Bridge at Ch 16.00 Km of Patan-Daltonganj (Bairiya Chowk to Saguna More)
2025_CECOM_100887_1
1/RCD/Daltonganj/2025-26/401
Open Tender
Civil Works
Item Rate
540 days
PALAMU
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹10.2 L
10 Sept 2026
8 May 2025
30 May 2025
8 May 2025
29 May 2025
8 May 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .