| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.5 CrAccepted-Finance 268 237 MASTER KANHAIYA LAL ROAD AISHBAGH AISHBAGH LUCKNOW UTTAR PRADESH 226004 UDYAM UP 50 0018557 | LUCKNOW | UTTAR PRADESH | 226004 | L1 | Accepted-Finance L1 | |
| 2 | L2₹13.6 Cr+₹6.8 L (0.50%)Accepted-Finance | L2 | Accepted-Finance L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical Reject | |
| 4 | Rejected-Technical C 88 RDC RAJ NAGAR GHAZIABAD 201002 U P | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201002 | - | Rejected-Technical Reject | |
| 5 | Rejected-Technical | - | Rejected-Technical Reject |
Tender Value
₹13.6 Cr
EMD Value
₹13.6 L
Closing Date
14 Oct 2022, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
General Manager Zone-7 Lucknow
General Manager, Zone-7, U.P. Projects Corporation Ltd. Lucknow. Gomti Barrage, Left Bank, Gomti Nagar Luckow.
Construction of Tribal Museum at Lucknow, District- Lucknow (U.P.)
2022_UPPRC_730883_1
13/UPPCL/GM-7/E-TENDER/2022-23 Dated-16.09.2022
Open Tender
Civil Works - Buildings
Percentage
730 days
District- Lucknow (U.P.)
Please refer Tender documents.
2 documents required · 2 mandatory
₹17,700
Project Manager, Unit-14, Lucknow
₹13.6 L
20 Dec 2022
23 Sept 2022
14 Oct 2022
23 Sept 2022
14 Oct 2022
23 Sept 2022
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Tribal Museum at Lucknow, District- Lucknow (U.P.) | - | - | - | - |
| 2 | Boring with hydraulic piling rigs with power units, providing and installing cast in situ single under reamed piles of specified diameter and length below pile cap in M-25 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete. (Length of pile for payment shall be measured upto to the bottom of pile cap) : 300 mm dia piles | 3,603.14 | RMT. | 2,030 | ₹73,14,374.2 |
| 3 | Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge/Anchor piles method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of Engineer in-charge Single pile upto 50 tonne Safe capacity | - | - | - | - |
| 4 | Initial test (Test Load 2.5 times the Safe capacity) | 1 | Nos | 40,234 | ₹40,234 |
| 5 | Routine test (Test Load 1.5 times the Safe capacity) | 1 | Nos | 14,422 | ₹14,422 |
| 6 | Excavation of foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches. | 2,508.42 | CUM | 153 | ₹3,83,788.26 |
| 7 | Carted Earth filling. | 24.82 | CUM | 256 | ₹6,353.92 |
| 8 | Providing and laying in cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded stone aggregate 40 mm nominal size) and curing complete, excluding cost of form- work,in foundation and floors. | 575.52 | CUM | 5,794 | ₹33,34,562.88 |
| 9 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 93.96 | CUM | 801 | ₹75,261.96 |
| 10 | Treatment of soil under existing floors using chemical emul sion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor:With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 1,169.73 | SQM | 207 | ₹2,42,134.11 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_1181347.xls
BOQ Document • 1.93 MB
105787130.pdf
Tender Document • 2.68 MB
BIDDOCtribal.pdf
Tender Document • 4.35 MB
105787132.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .