Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAdmitted-Finance | ₹8.2 L | L1 | Admitted-Finance |
| 2 | L2₹8.3 LAdmitted-Finance | ₹8.3 L | L2 | Admitted-Finance |
| 3 | L3₹8.5 LAdmitted-Finance | ₹8.5 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | BHARAT KUMAR L2 | MANISH BHAGAT L1 | ENTER CONSTRUCTION L3 |
|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||||
| 2.00Installation of 4-inch pipeline with 500 GPM Pump-motor set and electricals | ||||||
| 3.00 | Loading, unloading, transportation and stacking of 4" dia pipe (New Kenda to CL Jambad) - 40 pipes | 2 | Nos | 9,006.7 ₹18,013.4 | 9,006.7 ₹18,013.4 | 10,000 ₹20,000 |
| 4.00 | Hire Charges of Transporting Vehicle (Truck) for pipes | 1 | Job | 13,200 ₹13,200 | 13,200 ₹13,200 | 15,000 ₹15,000 |
| 5.00 | Laying and Welding of 4" Dia Flanges with fitting (40 pipes, 80 flanges) | 3 | Nos | 5,382.34 ₹16,147.02 | 5,382.34 ₹16,147.02 | 6,000 ₹18,000 |
| 6.00 | Loading, unloading, transportation and laying of 4" dia pipe to OCP Pumping Site | 2 | Nos | 9,006.7 ₹18,013.4 | 9,006.7 ₹18,013.4 | 10,000 ₹20,000 |
| 7.00 | Joining of 4" dia pipes (250 meters) as per proposed path | 4 | No | 10,328.03 ₹41,312.12 | 10,000 ₹40,000 | 10,500 ₹42,000 |
| 8.00 | Fabrication of short pieces, reducers, bends, etc. (15 pieces) | 1 | No | 5,382.34 ₹5,382.34 | 5,000 ₹5,000 | 5,500 ₹5,500 |
| 9.00 | 500 GPM Pump-Motor set alignment with base plate fabrication | 2 | No | 10,473.58 ₹20,947.16 | 10,000 ₹20,000 | 10,600 ₹21,200 |
| 10.00 | Transportation and installation of Pump-Motor set at Pumping site +1 | 1 | Nos | 13,019.2 ₹13,019.2 | 13,000 ₹13,000 | 13,200 ₹13,200 |
Tender Value
₹9.7 L
EMD Value
₹12,100
Closing Date
2 Mar 2026, 5:00 pmClosed
Area Engineer(EnM)
Kenda Area
1. Installation of 4-inch pipeline with 500 GPM Pump-motor set and electricals with supply of allied items 2. Installation of 6-inch pipeline with installation of 1000 GPM Pump-Motor Set
2026_ECL_353731_1
GM/KND/AE(ENM)/55(TN)/25-26/67
Open Tender
Miscellaneous Works
10 days
CL Jambad Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹12,100
11 Mar 2026
19 Feb 2026
3 Mar 2026
19 Feb 2026
2 Mar 2026
19 Feb 2026
19 Feb 2026 - 26 Feb 2026
Item Description/ Heading
Installation of 4-inch pipeline with 500 GPM Pump-motor set and electricals
Loading, unloading, transportation and stacking of 4" dia pipe (New Kenda to CL Jambad) - 40 pipes
Hire Charges of Transporting Vehicle (Truck) for pipes
Laying and Welding of 4" Dia Flanges with fitting (40 pipes, 80 flanges)
Loading, unloading, transportation and laying of 4" dia pipe to OCP Pumping Site
Joining of 4" dia pipes (250 meters) as per proposed path
Fabrication of short pieces, reducers, bends, etc. (15 pieces)
500 GPM Pump-Motor set alignment with base plate fabrication
Transportation and installation of Pump-Motor set at Pumping site +1
Transportation and installation of Starter and Cables at Pumping site +1
Supply of M.S. Bolt-Nut-Washer (5/8" x 2.5")
4 Inch Flange
Supply of HT Bolt Nut of 4" x 1" with washer for Pump-Motor (12 pcs) +1
Supply of Tyre for Coupling (Fenner 120) +1
Supply of Welding Electrodes for fabrication jobs +1
Supply of 4" dia Sluice Valve for Delivery range +1
Supply of 4" dia Non-Return Valve for Delivery range +1
Supply of 6" Dia Foot Valve for Suction +1
Cost of DA + Oxygen for cutting and fabrication job +1
Installation of 6-inch pipeline with installation of 1000 GPM Pump-Motor Set
Loading, unloading, transportation and stacking of 6" dia pipe (New Kenda to CL Jambad) - 40 pipes
Hire Charges of Transporting Vehicle (Truck) from New Kenda Colliery to CL Jambad
Laying and Welding of 6" Dia Flanges with fitting (40 pipes, 80 flanges)
Loading, unloading, transportation and laying of 6" dia pipe to OCP Pumping Site
Joining of 6" dia pipes (250 meters) from Pumping station to discharge point
Fabrication of short pieces, reducers, bends, half-bends etc. (15 pieces)
Supply of M.S. Bolt-Nut-Washer (5/8" x 2.5")
Supply of Welding Electrodes for welding flanges and other fabrication
Supply of 6" dia Sluice Valve for fitting in Delivery
Supply of 6" dia Non-Return Valve for fitting in Delivery
Supply of 6" Dia Foot Valve for fitting in Suction
Cost of DA + Oxygen for cutting Job (1 DA + 3 Oxygen)
Transportation for Pump-Motor Set from Poniati Workshop to CL Jambad OCP
Hire Charges of Transporting Truck from Poniati Workshop to CL Jambad OCP
1000 GPM Pump-Motor set alignment with base plate fabrication +1
Transportation and installation of Pump-Motor set at Pumping site +1
Transportation and installation of Starter and Cables at Pumping site +1
Hire Charges of Transporting Truck for pipes, motor pump, starter, etc. +1
Supply of HT Bolt Nut of 4" x 1" with washer for Pump-Motor +1
Supply of Tyre for Coupling (Fenner 120) +1
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.59 MB
Tendernotice_2.pdf
PDF • 1.25 MB
BOQ_366536.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid