| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-AOC 1 PNETH CHOORI CHAMBA CHAMBA HIMACHAL PRADESH 176311 UDYAM HP 02 0007745 | CHAMBA | HIMACHAL PRADESH | 176311 | ₹3.4 L | L1 | Accepted-AOC Lower Quoted rates |
| 2 | L2₹4.0 LRejected-Finance | ₹4.0 L | L2 | Rejected-Finance Higher Quoted Rates |
| 3 | L3₹4.2 LRejected-Finance | ₹4.2 L | L3 | Rejected-Finance Higher Quoted Rates |
| 4 | Not Admitted-Fee/PreQual/Technical 0 NGG POWER TECH INDIA PRIVATE LIMITED VILLAGE JHOLAN MAJRA PO POLIAN BEET TEHSIL HAROL JHOLAN UNA HIMACHAL PRADESH 174503 | UNA | HIMACHAL PRADESH | 174503 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹3.8 L
EMD Value
₹3,846
Closing Date
5 Jan 2026, 5:00 pmClosed
Sr. Executive Engineer
Sr. Executive Engineer Electrical Division Gagret
Please refer tender Document
2025_HPSEB_124670_1
GED-162/2025-26
Open Tender
Electrical Works
90 days
Daulatpur
Tender for Prov. and erection of 11 KV HT line to proposed 11/0.4 KV 100 KVA substation along with new 3-Phase LT line interlinking with existing 63 KVA substation GN-9th to improve low voltage at village Nangal Jariyalan under ESD Daulatpur.
2 documents required · 2 mandatory
₹590
Yes
₹3,846
Yes
2 Apr 2026
29 Dec 2025
6 Jan 2026
29 Dec 2025
5 Jan 2026
29 Dec 2025
Erection of new Steel Tubular Pole 9 mtr. Long Digging of Pit,fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect.
Erection of S.T Double Pole 9 Mtr. Long for Tapping and Dead end Structure :- Digging of Pit fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect.
Erection of Earthing Set.:- Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect.
Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect.
Stringing and Sagging conductor:-:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/4.26 (100 mm2) Conductor of 11 KV HT line complete in all respect.
G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.
Electrical Inspection Fees for HT and Substation Complete in All respect.
Supply Part of HT Line
Prov. Conductor 7/4.26 (100 mm2) {Includes 3 conductor lengths for 3Φ and Additional 1% (Sag, Jumpering and wastage} (1.182 Kms Supply by HPSEBL)
Prov. Steel Tubular Poles (9 m, Working Load > 227 kgf/m²) (with Ruling Span 90 m, 8 No. Run thro' and 3 No. Double Pole Dead End Structures) (8 Nos. Supply by HPSEBL)
Prov. RCC Muffs with concerete filling
Prov. Cross Arm: [Channel Iron (100x50x6 mm), Length (1270) mm i/c tolerance of 100 mm either sider) x 8 structure.
Prov. Angle Iron (50x50x6 mm), Length (750 mm x 2 x 8 structures
Prov. Pole Top Bracket [MSCI: 100x50x6 mm 100 mm)
Prov. 11 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure (12 Nos. Supply by HPSEBL)
Prov. Belt Set - MS Angle Iron: 50x50x6, Length 1800 mm x 2 No.
Prov. X-Bracing Set - MS Angle Iron: 50x50x6, Length 2125 mm x 2 No.
Prov. X-Arm (Horizontal) - MS Channel Iron: 100X50x5, Length 2340x2 mm x 2 No. formation.
Prov. Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) x (3 No. conductors) x (2 No. sides) (9 Set Supply by HPSEBL)
Prov. 11 kV Pin Insulators (Porcelain, 12 kV, 10 kN): 3 No per double pole structure (6 Nos. Supply by HPSEBL)
Prov. Stay set complete in all respect (1No. / Single Pole , 4 No. / Double Pole Structures)
Prov. Stay Wire (7/3.15 mm) (9.0 kg Per Stay Set) (81 Kg Supply by HPSEBL)
Prov. HT Earthing set complete (REC constr. Stand J-1)
Prov. Single Continous Earth wire (GI, 8 SWG) {alongwith 2 wire lengths for avg. one road crossing @ 20 m and Additional 1% (Sag and wastage)} @ 0.102 kg/m (40 Kg Supply by HPSEBL)
Prov. Eye Hook for earth wire
Prov. Earth Reel
Prov. Half Clamp [on double pole dead end str. 4 Nos.on run through str. 2 Nos.]
Prov. Full Clamp (on double pole dead end str. 4 Nos.) single pole on run through str. 2 Nos.
Prov. Danger Plate (250X200X1.6 mm) (6 Nos. Supply by HPSEBL)
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Prov. Barbed Wire
Prov. Red Oxide
Prov. Aluminium Paint
Prov. X-Arm: [Channel Iron (75x40x4.8 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
Prov. Switch Handle Supporting: [Channel Iron (75x40x4.8 mm), Length : 460 mm
Prov. GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type (1 Set Supply by HPSEBL)
Prov. D.O Fuse Unit
Erection Part of 11/0.4 KV, 100 KVA Transformer
Erection of S/Stn. Str.:-Digging of Pit for S/T Pole and earthing, drilling of holes in X-arm, preparation of plate form str. Member CI, Alluminium Paint AI i.e X-arml, Knee bracing set, erection of D-pole,errection of plate form, ercetion of x-Arm, drop out, fuse unit, linghting arrestor, MCCB Switch of LT Box, Energy Meter, Erection of T/F, and earthing conn. to T/F G.O Switch lightning etc. erection of Stay Set, Erection of Jumper, Pipe earthing 3 Nos., Erection of LT cable, brabed wire and painting, 3 Nos. earthing to S/Stn. by prov. 50Kg Salt charcole in each earthing i/c construction of trench for earthing as per REC Board Standard complete in all respect. ( 100 KVA Transformer)
Prov. & erection of Chain link fencing angle iron, Gate etc. for transformer fencing.
Supply Part of 11/0.4 KV, 100 KVA Transformer
Prov. Distribution Transformer (Ordinary), 11/0.4 kV, 100 KVA (1 No Supply by HPSEBL)
Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) (2 Nos. Supply by HPSEBL)
Prov. RCC Muffs with concerete filling
Prov. X-Arm: [Channel Iron (100x50x5 mm), Length : 2800 mm X 2 Nos] for incomer line
Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 1 Nos for LA.
Prov. X-Arm: [Channel Iron (75x40x4.8 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
Transformer Belting & Knee Bracing
Prov. X-Arm: [Channel Iron (100x50x5 mm), Length : 2800 mm X 2 Nos] for Transformer Bed
Prov. X-Arm [Channel Iron (100x50x6 mm), Length : (460 mm) x 2 Nos for supporting Main Channel of Transformer]
Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos
Prov. MS Angle Iron (35X35x6 mm), Length : 460 mm x 2 Nos
Prov. MS Angle Iron (50X50x6 mm), Length: 950 mm x(2 Nos for Bed Knee Bracing)
Transformer L.T Distribution Box and GO Switch fixing Assembly
Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos
Prov. MS Angle Iron (50X50x6 mm), Length : 450 mm x 1 No.
Prov. Switch Handle Supporting: [Channel Iron (75x40x4.8 mm), Length : 460 mm
Prov. GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type (1 Set Supply by HPSEBL)
Prov. D.O Fuse Unit
Prov. Surge Arrester, 9 kV Station Class (Porcelain Type)
Prov. Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) (3 Set Supply by HPSEBL)
Prov. Stay set complete
Prov. Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set) (28 Kg Supply by HPSEBL)
Prov. Pipe Earthing Set (3 Set Supply by HPSEBL)
Prov. 6 SWG GI wire For Earthing (15 Kg Supply by HPSEBL)
Prov. Panel (Distribution Box LT 100 kVA DTR MS Sheet of 1.6 mm ( 900x800x200 mm ) cubide Box complete with stand etc and Al Busbar (25x6mm)inside .painted /powder coated after primar coating MCCB 160 amp 3P 35kA , ICS =100 % ICU, Kit-Kit 200 Amp 100 KVA DTR
Prov. Half Clamp (M.S. Flat 50X6 mm)
Prov. Full Clamp (M.S. Flat 50X6 mm)
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Prov. Aluminium Thimble (24 Nos. Supply by HPSEBL)
Prov. Copper Thimble 200 Amp
Prov. Danger Plate (1 Nos. Supply by HPSEBL)
Prov. Barbed Wire
Prov. LT Cable 3.5 X 120 mm² 1.1 kV XLPE Cable Unarmoured
Prov. Energy Meters LT 3-ɸ, 4 wire CT operated Static Tri-Vector meter (CT-200/5 A), Accuracy Class: 0.5S, Category-C, DLMS for 100 KVA Transformer
Prov. Aluminium Paint.
Prov. Red Oxide
Erection Part of 3-Phase LT Line
Erection of LT line:-Digging of pit of stay, Erection of Steel Pole 8 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming, painting of Poles etc.complete in all respect.
Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect.
Stringing and sagging conductor:- Laying of conductor AAAC 7/3.15 (55mm2) stringing and sagging, binding with insulator complete in all respect.
G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.
Supply Part of 3-Phase LT Line
Prov. Conductor 7/3.15 (55 mm2) Additional 1% (Sag, Jumpering and wastage} (0.808 Kms. Supply by HPSEBL)
Prov. Steel Tubular Poles 8 Mtr Long along with base plate complete in all respect (3 Nos. Supply by HPSEBL)
Prov. RCC Muff with concrete filling
Prov. Channel Iron (75x40x4.8) [Length- 1.50 Mtr + 0.2 Mtr]( 2 Nos for Height Piece)
Prov. Shackle Insulator (16 Kn)
Prov. D-Iron (U-Clamps) (12 Nos. Supply by HPSEBL)
Prov. Earth Knob
Prov. LT Stay Set (i/c Stay clamp)
Prov. Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set (18 Kg Supply by HPSEBL)
Prov. Full Clamps [ 2 No for A.I + 1 No for Stay Set]
Prov. Earthing Set complete
Prov. Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m (20.50 kg Supply by HPSEBL)
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Prov. Spiral PVC Spacer (6 Nos. Supply by HPSEBL)
Prov. Aluminium Paint.
Prov. Red Oxide
Loading of DTR, HT, LT Line materials on truck at Divisional Store and same material unloading at road head of site of work and Manual Carriage of DTR, HT, LT Line and allied Material For Average Distance From Road To Site Of Work .(If required as per site).
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
B.rar
Tender Documents • 0.48 MB
BOQ_183258.xls
BOQ • 2.06 MB
Spc.pdf
Additional Documents • 6.24 MB
Download all tender documents and submit your bid