Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.3 LAccepted-Finance 879 SHAHBAD BHOOR BAREILLY BHOOR BAREILLY BAREILLY BAREILLY UTTAR PRADESH 243001 UDYAM UP 15 0003299 | BAREILLY | UTTAR PRADESH | 243001 | ₹1.3 L | 1 | Accepted-Finance Found in Order |
| 2 | 2₹1.3 LAccepted-Finance | ₹1.3 L | 2 | Accepted-Finance Found in Order |
| 3 | 2₹1.5 LAccepted-Finance | ₹1.5 L | 2 | Accepted-Finance Found in Order |
| 4 | 3₹1.5 LAccepted-Finance 259 ANAND VIHAR COLONY NAWADA SEKHAN PILIBHIT BYPASS ROAD BAREILLY UTTAR PRADESH 243005 | BAREILLY | UTTAR PRADESH | 243005 | ₹1.5 L | 3 | Accepted-Finance Found in Order |
Tender Value
Refer Docs
EMD Value
₹3,000
Closing Date
1 Mar 2021, 6:30 pmClosed
EXECUTIVE ENGINEER
220 KV Sub Station Nawada Aonla Road Budaun
Loading Unloading Carriage of ACSR Moose Conductor Drums from 220KV Substation Sultanpur to 132 KV SAS Substation Bilsi Distance approx 500 Km along with other associated Works under ETD Budaun
2021_UPTCL_559046_1
T13
Open Tender
Miscellaneous Works
30 days
ETD BUDAUN
Please refer Tender documents.
2 documents required · 2 mandatory
₹236
EXECUTIVE ENGINEER
₹3,000
Yes
2 Mar 2021
24 Feb 2021
2 Mar 2021
24 Feb 2021
1 Mar 2021
24 Feb 2021
24 Feb 2021 - 1 Mar 2021
Amount
1. Loading, Unloading & Carriage, of ACSR Moose Conductor Drums from 220KV Substation, Sultanpur to 132 KV S.A.S. Substation Bilsi (Distance approx. 500 Km) along with other associated Works, with all cost of Men, Materials, Misc. Consumables, Trailers / Trucks, Crane / Hydra, T&Ps etc. required for satisfactory completion of the Job, as per Technical Specifications & direction of the Supervising Engineer, as per details below : Shifting & Safe Loading of ACSR Moose Conductor Drums (1 Drum containing Approx. 1500Mtr. Conductor) at 220KV Substation, Sultanpur with the help of Hydra / Crane and Manual Labour on suitable capacity vehicle.
Safe Carriage of ACSR Moose Conductors in Drums (1 Drum containing Approx. 1500Mtr. Conductor), Loaded on suitable capacity vehicle (vehicles to be arranged by the Contractor) with all due Safety & Precautions from 220KV Substation, Sultanpur to 132KV S.A.S. Substation Bilsi. (Distance approx. 500 Km) (Not more than 02 No. Drums on one vehicle; 1 Job for each Vehicle)
Safe Unloading of ACSR Moose Conductors in Drums (1 Drum containing Approx. 1500 Mtr. Conductor) from suitable capacity vehicle with the help of Hydra / Crane and Manual Labour, then Shifting & Proper Stacking at Designated Storage Place at 132KV S.A.S. Substation Bilsi.
Shifting & Safe Loading of ACSR Moose Conductor Drums (1 Drum containing Approx. 1500Mtr. Conductor) at 220KV Substation, Sultanpur with the help of Hydra / Crane and Manual Labour on suitable capacity vehicle.
Safe Carriage of ACSR Moose Conductors in Drums (1 Drum containing Approx. 1500Mtr. Conductor), Loaded on suitable capacity vehicle (vehicles to be arranged by the Contractor) with all due Safety & Precautions from 220KV Substation, Sultanpur to 132KV S.A.S. Substation Bilsi. (Distance approx. 500 Km) (Not more than 02 No. Drums on one vehicle; 1 Job for each Vehicle)
Safe Unloading of ACSR Moose Conductors in Drums (1 Drum containing Approx. 1500 Mtr. Conductor) from suitable capacity vehicle with the help of Hydra / Crane and Manual Labour, then Shifting & Proper Stacking at Designated Storage Place at 132KV S.A.S. Substation Bilsi.
Shifting & Safe Loading of 40mm MS Round Bar (Weight Approx 5 MT) at 132KV Substation, Usawan with the help of Hydra / Crane and Manual Labour on suitable capacity vehicle.
Safe Carriage of 40mm MS Round Bar (Weight Approx 5 MT) Loaded on suitable capacity vehicle (vehicles to be arranged by the Contractor) with all due Safety & Precautions from 132KV Substation, Usawan to 132KV S.A.S. Substation Sahaswan. (Distance approx. 100 Km).
Safe Unloading of 40mm MS Round Bar (Weight Approx 5 MT) from suitable capacity vehicle with the help of Hydra / Crane and Manual Labour, then Shifting & Proper Stacking at Designated Storage Place at 132KV S.A.S. Substation Sahaswan.
Shifting of Healthy / used Substation Equipments from Old Store to Newly Constructed indoor store with the help of Hydra / Crane due to dismantling of old store on account of construction of new 132KV Bay at 132KV Substation Bisauli. The work includes loading, shifting and unloading and proper stacking of all healthy / used substation equipments with all due care and precaution.
M/S ASEEM ALAM CONTRACTOR
M/S A R K ELECTRICALS
M/s S.S. Refregeration
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid