Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.7 CrAdmitted-Finance | -32.33% | ₹2.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.0 Cr+₹29.3 L (10.8%)Admitted-Finance | -25.00% | ₹3.0 Cr+₹29.3 L (10.8%) | L2 | Admitted-Finance |
| 3 | L3₹4.0 Cr+₹1.3 Cr (47.8%)Admitted-Finance | +0.00% | ₹4.0 Cr+₹1.3 Cr (47.8%) | L3 | Admitted-Finance |
Tender Value
₹4.0 Cr
EMD Value
₹8.0 L
Closing Date
18 Jun 2026, 6:00 pmClosed
S E PWD R and B Circle South Jammu
S E PWD R and B Circle South Jammu
Upgradation of Satwari R.S. Pura Road upto Kullian Peer Baba
2026_PWDJK_311067_1
e-NIT No.SESJ/11 of 2026-27 dated 26-05-2026
Open Tender
Civil Works
Percentage
Satwari R.S. Pura Road upto Kullian Peer Baba
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
S E PWD R and B Circle South Jammu
₹8.0 L
S E PWD R and B Circle South Jammu
8 Aug 2026
26 May 2026
19 Jun 2026
26 May 2026
18 Jun 2026
26 May 2026
5 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing & Laying Bituminious Macadam using crushed stone aggregate of specified grading Premix with bituminous binder, transported to site by tipper, laid over a Previous prepared surface with paver finisher equipped with electronic sensor to the required grade, level & alingment & rolling with smoothed wheeled, vibratory & and tandem roller all complete job. ( 50mm thick compacted thickness ) | 35 | cum. | 8,734.35 | ₹3,05,702.25 |
| 2 | Providing and laying semi- dense Bituminous concrete using crushedstone aggregates of specified grading, premixed with bituminous binderand filler, transporting the hot mix to work site by tippers, laying withpaver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge. 25 mm compacted thickness with bitumen of grade VG- 30 @5% (percentage by weight of total mix) and lime filler @ 2% (percentageby weight of Aggregate) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity. | 6,300 | sqm. | 298.5 | ₹18,80,550 |
| 3 | Providing and applying tack coat using hot straight run bitumen of grade – VG-30, including heating the bitumen, spraying he bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications. On bitumen surface @ 0.50 Kg/sqm. | 6,300 | sqm. | 56.1 | ₹3,53,430 |
| 4 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge: 1:3:6 or richer mix (i/c equivalent design mix) | 162 | cum. | 1,725.2 | ₹2,79,482.4 |
| 5 | Demolishing RCC work manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge | 56.7 | cum. | 2,516.85 | ₹1,42,705.4 |
| 6 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil | 4,200 | cum. | 256.85 | ₹10,78,770 |
| 7 | P/L in position Cement conc. 1 cement:4fine sand8graded crushed stone agg. 40 mm excluding the cost of centring & shuttering all work upto plinth level. | 599 | cum. | 5,202.9 | ₹31,16,537.1 |
| 8 | Providingand and laying in position specified grade of reinforced cement concrete (1:3:6) excluding the cost of centering. shuttering, finishing and reinforcement-All work upto plinth level. | 315 | cum. | 5,733.6 | ₹18,06,084 |
| 9 | Providingand and laying in position specified grade of reinforced cement concrete (1:1.5:3) excluding the cost of centering. shuttering, finishing and reinforcement-All work upto plinth level. | 1,066.5 | cum. | 7,788.4 | ₹83,06,328.6 |
| 10 | Reinforcement for RCC works including straightening, cutting, bending, placing in position and binding all complete | 1,06,650 | kg | 123.2 | ₹1,31,39,280 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.21 MB
BOQ_1007029.xls
BOQ • 0.27 MB
Extension2nd.pdf
PDF • 0.41 MB
ExtensionNotice.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .