Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 LAdmitted-Finance | -41.79% | ₹1.1 L | L1 | Admitted-Finance |
| 2 | L2₹1.2 L+₹9,525.60 (8.35%)Admitted-Finance | -36.93% | ₹1.2 L+₹9,525.60 (8.35%) | L2 | Admitted-Finance |
| 3 | L3₹1.7 L+₹52,508.41 (46.0%)Admitted-Finance | -15.00% | ₹1.7 L+₹52,508.41 (46.0%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-SAME E STAMP USED AT SR NO 40 |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-BIDDER MUST WRITE TENDER ID NAME OF WORK ON CDR AS PER NIT WITH DULY PEN |
Tender Value
₹2.0 L
EMD Value
₹3,920
Closing Date
24 Aug 2026, 4:30 pmClosed
Er. fayaz Ahmed
Executive engineer REW Ramban
AS PER NIT
2026_RDPR_319890_41
e-Nit15.2of REW Ramban( BANHIAL)
Open Tender
Civil Works
Percentage
BANIHAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive engineer REW Ramban
₹3,920
12 Sept 2026
8 Aug 2026
25 Aug 2026
8 Aug 2026
24 Aug 2026
8 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. | - | cum | 592.9 | - |
| 2 | Dry stone pitching (any thickness) including cost of stones | - | cum | 1,210 | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | - | cum | 5,733.6 | - |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for:foundations ,footings bases of column | - | sqm | 286.35 | - |
| 5 | Carriage of cement from source to site by mechanical transport or animal transport or by head load | - | Ton | 445.72 | - |
| 6 | Carriage of Sand from source to site by mechanical transport or animal transport or by head load | 1 | cum | 1,403.95 | ₹1,402.55 |
| 7 | Carriage of Stone Aggregates below 20mm from source to site by mechanical transport or animal transport or by head load | - | cum | 1,208.8 | - |
| 8 | CIB( citizen information board) size 2'6''x1'6'' Granite Stone ( complete job) | - | nos | 3,000 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.20 MB
BOQ_1061901.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .