Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Finance | -25.00% | ₹1.5 L | L1 | Admitted-Finance |
| 2 | L2₹1.5 LAdmitted-Finance | -24.09% | ₹1.5 L | L2 | Admitted-Finance |
Tender Value
₹2.0 L
EMD Value
₹3,920
Closing Date
16 Mar 2026, 6:00 pmClosed
Er. Raman Kumar (Xen PWD Chenani)
PWD OFFICE CHENANI
Refer to BOQ
2026_PWDJK_305726_4
Fresh e-NIT No. 93 of 2025-26 Dated 09-03-2026
Open Tender
Civil Works
30 days
Chenani
Refer to e-NIT/SBD
2 documents required · 2 mandatory
₹600
XEN PWD CHENANI
₹3,920
24 Mar 2026
9 Mar 2026
18 Mar 2026
9 Mar 2026
16 Mar 2026
9 Mar 2026
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Dismantling old protection work including cutting of crates and stacking of stones.
Placing and laying of Hand Packed stone filling in wire crates of 4mm dia GI wire of 100 mm x 100mm mesh mechanically woven including the cost of stones and crates all job complete.
Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete.Non-pressure NP-3 class (Medium duty) R.C.C. pipes 1000 mm dia. R.C.C. pipe (laying by manual/mechanical means)
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns.
Carriage 0f material by mechanical transport including loading ,unloading and stacking completed sand lead up to 70.00 km
Carriage of material by mechanical transport including loading ,unloading and stacking completed stone aggregate below 40 mm lead up to 20.00km
Carriage of material by mechanical transport including loading ,unloading and stacking completed stone lead up to 5.00 km
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_992873.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid