Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-Finance | ₹2.5 L | L1 | Accepted-Finance L1 |
| 2 | L2₹2.5 LRejected-Finance | ₹2.5 L | L2 | Rejected-Finance L2 |
| 3 | L3₹2.6 LRejected-Finance | ₹2.6 L | L3 | Rejected-Finance L3 |
Tender Value
₹2.5 L
EMD Value
₹4,996
Closing Date
5 Feb 2026, 9:00 amClosed
PRADHAN
SITTONG III GP SHELPU KHASMAHAL
CONSTRUCTION OF WATER TANK WITH PIPE AT LATPUNCHAR COMMUNITY HALL SANSAD II SITTONG III GRAM PANCHYAT
2026_GTA_994173_4
04/SIT3/NIT /15th FC/2025-26
Open Tender
CIVIL WORKS
30 days
LATPANCHAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,996
5 Mar 2026
28 Jan 2026
9 Feb 2026
28 Jan 2026
5 Feb 2026
28 Jan 2026
Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing,spreading or stacking the spoils within a lead of 75m.as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. Depth of excavation not exceeding 1500 mm.
Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth.
Cost of stone boulder 150 mm size delivered and stacked at site.
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. River Bazree
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. River Bazree
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. For works in foundation, basement and upto roof of ground floor upto 4 mt.
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) a) 25mm to 30 mm thick wooden shuttering as per discussion and direction of Engineer-in-charge.
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface (ii) With 4:1 cement mortar (b)20 mm thick
Neat cement punning about 1.5mm thick in wall, dado, windowsill, floor etc.NOTE:Cement 0.152 cu.m per100 sq.m.
Supplying, fitting and fixing G.I. pipes of TATA make with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads, fitting, fixing etc.complete in all respect including cost of necessary fitting as required, jointing materials and two coats of painting with approved paint in any position above ground.( Payment will be made on the center line measurements of total pipe line including all specials. No seperate payment will be made for accesorie, specials.).For exposed work 25mm dia medium quality
Supplying, fitting and fixing G.I. pipes of TATA make with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew,reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads, fitting, fixing etc.complete in all respect including cost of necessary fitting as required, jointing materials and two coats of painting with approved paint in any position above ground.( Payment will be made on the center line measurements of total pipe line including all specials. No seperate payment will be made for accesorie, specials.). For exposed work 15mm dia medium quality
Plum Concrete work with 40 % Cement Concrete with 30 mm down graded stone metal and 60% stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any. 1:3:6 proportion
Display Board
ADD 18% GST
ADD 1% CESS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
BOQ_2432542.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid