Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Finance | -29.30% | ₹1.4 L | L1 | Admitted-Finance |
| 2 | L2₹2.0 LAdmitted-Finance | +1.00% | ₹2.0 L | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-Mismatch name of work in Try challan & Affidavit Bid correctness |
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
6 Feb 2026, 4:00 pmClosed
Executive Engineer PWD (RnB) Division Doda
Executive Engineer PWD (RnB) Division Doda
As per NIT/SBD
2026_PWDJK_301998_2
e-NIT 86 of 2025-26
Open Tender
Civil Works
30 days
Doda
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Yes
Treasury Challan under MH 0059
₹4,000
Yes
27 Feb 2026
31 Jan 2026
7 Feb 2026
31 Jan 2026
6 Feb 2026
31 Jan 2026
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil :1 meter from cutting edge.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Providing and fixing PVC Pipe 8" dia
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete.
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
Carriage of Meterial by Mechanical Transport including loading and unloading and stacking complete job at site.
Carriage o fSand at an average lead of 22.00kms by MT
Carriage of Bajree at an average lead of 10.00kms by MT
Carriage of Bajree above 40mm at an average lead of 10.00kms by MT .
Carriage of Mulba at an average lead of 2.00kms by MT.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_979759.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid