Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.6 LAccepted-Finance GURUGURAM | GURUGRAM | HARYANA | 122001 | ₹18.6 L | L1 | Accepted-Finance Accept |
| 2 | L2₹18.7 LRejected-Finance | ₹18.7 L | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | TRT Group of Traders L2 | SANTHOSHARIDEVAN AND CO L1 |
|---|---|---|---|---|---|
| 1.00Construction of 30000 Lit's Capacity OHT (12.00m Staging Height ) No 3 Komarapalayamalayam H/O No 3 Komarapalayamalayam | |||||
| 2.00 | Earth work Excavation for Foundation in all soils and Sub Soil as per SS20B for foundation etc. complete.SS 20B | 64.9 | Cum | 263.78 ₹17,119.32 | 260 ₹16,874 Lowest |
| 3.00 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with Standard specification. | 8.11 | Cum | 1,757.11 ₹14,250.16 Lowest | 1,757.11 ₹14,250.16 Lowest |
| 4.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 4.78 | Cum | 5,476.79 ₹26,179.06 Lowest | 5,476.79 ₹26,179.06 Lowest |
| 5.00 | Brick work in cement mortar 1:5 mix using Fly bricks 83/4"x41/4"x23/4" including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 0.25 | Cum | 7,344.31 ₹1,836.08 Lowest | 7,344.31 ₹1,836.08 Lowest |
| 6.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 0.54 | Cum | 6,872.6 ₹3,711.2 Lowest | 6,872.6 ₹3,711.2 Lowest |
| 7.00 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 4.73 | Cum | 285.32 ₹1,349.56 Lowest | 285.32 ₹1,349.56 Lowest |
| 8.00Reinforced cement concrete 1:1.5:3mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete | |||||
| 9.00 | Items 1.50 m to 4.50m below GL | 8.62 | Cum | 9,511.08 ₹81,966.49 Lowest | 9,511.08 ₹81,966.49 Lowest |
| 10.00 | Items 0 m to 1.50m below GL | 1.75 | Cum | 9,372.31 ₹16,392.17 Lowest | 9,372.31 ₹16,392.17 Lowest |
Tender Value
₹19 L
EMD Value
₹19,000
Closing Date
22 Oct 2025, 3:00 pmClosed
BDO BP
Block Development office, Vennandur
Construction of 30000Lit OHT at No3. Komarapalayam H/O No3.Komarapalayam
2025_RDTN_614675_1
2804/20225/A2
Open Tender
Civil Works - Buildings
Item Rate
120 days
Vennandur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹19,000
Yes
29 Jul 2026
16 Oct 2025
22 Oct 2025
16 Oct 2025
22 Oct 2025
16 Oct 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_734416.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_734416.xls
BOQ • 0.31 MB
No3ohttechnicalbid.pdf
Tender Documents • 1.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].