Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical 2277 RAJA PARK RANI BAGH RANI BAGH NORTH WEST DELHI DELHI 110034 | NORTH WEST DELHI | DELHI | 110034 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical FLAT NO 134 TF POCKET C SECTOR B 2 NARELA DELHI 110040 | NORTH | DELHI | 110040 | Admitted-Fee/PreQual/Technical |
Tender Value
₹3.9 Cr
EMD Value
₹7.8 L
Closing Date
11 May 2026, 3:00 pmClosed
Dr Ashok Kumar
Urban Environment Division, GMDA, Gurugram
Construction of EPDM Synthetic Track
2026_HRY_518957_1
2026FB1B4B5C 4B92 47A2 901D 2BA3DCF3D3531068001
Open Tender
Civil Works - Others
Works
1980 days
Gurugram
2 documents required · 2 mandatory
₹5,000
₹7.8 L
Yes
26 May 2026
1 May 2026
11 May 2026
1 May 2026
11 May 2026
1 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Laying and Jointing PVC Pipe. Heading | |||||
| 1.01 | Supply and installation of FIBA approved and IAAF Approved Lab Tested synthetic polyurethane (PU) system for Jogging Track. The product must have 16 mm total thickness with base layer (Recycled Rubber Granules) of 8mm thickness and top layer {Ethylene Propylene Diene Monomer (EPDM)} of 8mm thickness respectively and should conform to the technical specifications: having Force Reduction between 36%-40%, Vertical Deformation 1.3-1.7mm, Permeability 0.058-0.06 cm/s, tensile strength 0.55-.0.57 N/mm2 to be laid on prepared sub base with line markings as per FIBA guidelines and as per the instructions of the Engineer In-Charge complete in all respect. Materials used should be from IAAF/WA approved manufacturer only.
(Make - Conica/Rekortan/Porplastic/ Stobitan) | - | Sqm | 100 | - |
| 1.02 | Upkeep/ Maintenance of the synthetic polyurethane (PU) system for Jogging Track through deployment 02 Nos manpower (each day) and machine. Routine inspection like removal of debris, objects, metal, etc. from Walking/Jogging Track. One time a month dry cleaning by blower and Water Cleaning by using water jet Four times a year. minor repair work of jogging track (synthetic material should be inclusive). For 01st year | - | Per Month | 100 | - |
| 1.03 | Upkeep/ Maintenance of the synthetic polyurethane (PU) system for Jogging Track through deployment 02 Nos manpower (each day) and machine. Routine inspection like removal of debris, objects, metal, etc. from Walking/Jogging Track. One time a month dry cleaning by blower and Water Cleaning by using water jet Four times a year. minor repair work of jogging track (synthetic material should be inclusive. For 02nd year | - | Per Month | 100 | - |
| 1.04 | Upkeep/ Maintenance of the synthetic polyurethane (PU) system for Jogging Track through deployment 02 Nos manpower (each day) and machine. Routine inspection like removal of debris, objects, metal, etc. from Walking/Jogging Track. One time a month dry cleaning by blower and Water Cleaning by using water jet Four times a year. minor repair work of jogging track (synthetic material should be inclusive. For 03rd year | - | Per Month | 100 | - |
| 1.05 | Upkeep/ Maintenance of the synthetic polyurethane (PU) system for Jogging Track through deployment 02 Nos manpower (each day) and machine. Routine inspection like removal of debris, objects, metal, etc. from Walking/Jogging Track. One time a month dry cleaning by blower and Water Cleaning by using water jet Four times a year. minor repair work of jogging track (synthetic material should be inclusive. For 04th year | - | Per Month | 100 | - |
| 1.06 | Upkeep/ Maintenance of the synthetic polyurethane (PU) system for Jogging Track through deployment 02 Nos manpower (each day) and machine. Routine inspection like removal of debris, objects, metal, etc. from Walking/Jogging Track. One time a month dry cleaning by blower and Water Cleaning by using water jet Four times a year. minor repair work of jogging track (synthetic material should be inclusive. For 05th year | - | Per Month | 100 | - |
stage.html
html • 0.03 MB
cancelled_1.pdf
pdf • 0.19 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_597848.xls
BOQ • 0.35 MB
779060Z162083.pdf
Additional Documents • 1.86 MB
OT0162083.pdf
Other Document • 0.23 MB
Corrigendum_I_for_Others_EPDM.pdf
PDF • 0.45 MB
Corrigendum_II_for_Date_Time_EPDM.pdf
PDF • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .