Loading…
Loading…
Tender ID
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹41,664.87Admitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹53,662.13+₹11,997.25 (28.8%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹91,141.91+₹49,477.04 (118.8%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | ||
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
7 Apr 2026, 6:00 pmClosed
Executive Engineer PWD Division Gandoh
Executive Engineer PWD Division Gandoh
Stage Contract for maintenance and snow clearance of TKN Road from km 19th to km 27th
2026_PWDJK_307008_17
e-NIT 77 of 2025-26
Open Tender
Civil Works
Percentage
Gandoh
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD Division Gandoh
₹20,000
10 Apr 2026
31 Mar 2026
8 Apr 2026
31 Mar 2026
7 Apr 2026
31 Mar 2026
31 Mar 2026 - 3 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Slip Clerance In ordinary soil disposal lead upto 50 m and lift upto 1.5 m. | |||||
| 2Slip Clearance In soils; mixed with moorum /Kankar /shingle/b oulders; disposal lead upto 50 m and lift upto 1.5 m. | |||||
| 3Slip Clarance In soils; mixed with Decomposed Rocks; by blasting or any other means | |||||
| 4Slip Clearance In medium hard rocks by blasting | |||||
| 5Slip Clearance In hard rocks by blasting | |||||
| 6Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-ChargeAll kind of soil | |||||
| 7Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-ChargeOrdinary Rock | |||||
| 8Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge Hard Rock | |||||
| 9Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge Hard Rock( Blasting Prohabited) | |||||
| 10Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge All kinds of soil | |||||
stage.html
html • 0.03 MB
techsummary_996370.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_996370.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .