Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.2 LAccepted-AOC GITA BHAWAN NEAR MAA LALITA HOSPITAL BAWANBIGHA KARNIBAG DEOGHAR | DEOGHAR | JHARKHAND | 814112 | ₹54.2 L | L1 | Accepted-AOC OK |
| 2 | L2₹55.5 LRejected-AOC | ₹55.5 L | L2 | Rejected-AOC OK |
| 3 | L3₹55.5 LRejected-AOC AT TUNGRI CHAIBASA DIST WEST SINGHBHUM | CHAIBASA | WEST SINGHBHUM | JHARKHAND | ₹55.5 L | L3 | Rejected-AOC OK |
| 4 | L4₹55.9 LRejected-AOC JASIDIH DEOGHAR | DEOGHAR | JHARKHAND | 814112 | ₹55.9 L | L4 | Rejected-AOC OK |
| 5 | L5₹59.9 LRejected-AOC | ₹59.9 L | L5 | Rejected-AOC OK |
Tender Value
₹60.2 L
EMD Value
₹1.2 L
Closing Date
17 Mar 2026, 5:00 pmClosed
District Engineer
District Board, Deoghar
Construction of Library Building with Mul Bhut Subidha at Sarath, G.P. Sarath, Block Sarath under District Deoghar
2026_ZPDEO_111475_1
NIT - 20/2025-26 (Gr. No. 01)
Open Tender
Civil Works
Percentage
270 days
Sarath
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.2 L
18 Aug 2026
12 Mar 2026
19 Mar 2026
12 Mar 2026
17 Mar 2026
12 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | EARTH WORK IN EXCAVATION IN FOUNDATION Trenches in ordinary soil (vide classification of soil item -A) and disposal of excavated earth as obtained to a distance upto 50 M including all lift, leveling ramming the foundation trenches, removing roots of tree shrubs all complete as per approved design, building specification and direction of E/I | 57.67 | M³ | 151.82 | ₹8,755.46 |
| 2 | Extra for hard soil do……..do……. | 57.67 | M³ | 15.51 | ₹894.46 |
| 3 | Providing coarse clean local SAND IN FILLING in foundation trenches or in plinth including ramming and watering in layer not exceeding 150 mm thick with all leads and 1.5 M lifts including cost of all materials, labours, royalty and taxes all complete as per building specification and direction of Engineer In charge (Mode of measurement compacted volume) | 46.76 | M³ | 589.51 | ₹27,563.46 |
| 4 | Providing designation 75-B, BRICK FLAT SOLING joints filled with local sand including cost of watering, taxes and royalty all complete as per building specification and direction of Engineer In charge | 167.55 | M2 | 330.34 | ₹55,346.85 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 13.52 | M³ | 4,598.23 | ₹62,187.15 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 13.96 | M³ | 5,218 | ₹72,841.98 |
| 7 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mmnominal size) | 8.62 | M³ | 6,082.45 | ₹52,404.11 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 51.13 | M³ | 6,308.87 | ₹3,22,592.87 |
| 9 | Centring and shuttring do……….. Fdn. | 12.84 | M2 | 194.5 | ₹2,497.38 |
| 10 | Roof | 272.3 | M2 | 435.82 | ₹1,18,673.79 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.60 MB
Tendernotice_2.pdf
PDF • 0.82 MB
Tendernotice_3.pdf
PDF • 1.25 MB
BOQ_150533.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].