Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.1 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹33.2 L+₹1.1 L (3.44%)Rejected-AOC | L2 | Rejected-AOC ok | |
| 3 | L3₹33.5 L+₹1.4 L (4.48%)Rejected-AOC | L3 | Rejected-AOC ok | |
| 4 | L4₹34.6 L+₹2.5 L (7.78%)Rejected-AOC FLAT NO 151 BLOCK NO 1 DIAMOND SQUARE CGHS LTD PLOT NO 13A SECTOR 6 DWARKA NEW DELHI 110075 | NEW DELHI | SOUTH WEST DELHI | DELHI | 110075 | L4 | Rejected-AOC ok | |
| 5 | L4₹34.6 L+₹2.5 L (7.78%)Rejected-AOC WZ 1391 31 B NANGAL RAYA NEW DELHI 110046 | NEW DELHI | NEW DELHI | DELHI | 110046 | L4 | Rejected-AOC ok |
Tender Value
₹38.5 L
EMD Value
₹77,000
Closing Date
7 Dec 2020, 6:00 pmClosed
Garrison Engineer Gwalior
Garrison Engineer Morar Cantt Gwalior
8624/GWL/E8 OUTSOURCING THE RESOURCES FOR OPERATION, MAINT AND MANAGEMENT OF WATER SUPPLY INSTALLATION AT MORAR CANTT UNDER GE GWALIOR
2020_MES_394330_1
8624/GWL/E8
Open Tender
Miscellaneous Works
Item Rate
335 days
Garrison Engineer Gwalior
As per tender documents
9 documents required · 9 mandatory
₹500
Garrison Engineer
₹77,000
Yes
22 Dec 2020
10 Nov 2020
9 Dec 2020
10 Nov 2020
7 Dec 2020
24 Nov 2020
Amount
Out sourcing of M&O round the clock (i.e. 24 Hours in three shifts, each shift of 8 hours i.e Ist shift from 0600 Hours to 1400 hours, 2nd shift 1400 hours to 2200 hours and 3rd Shift 2200 hours to 0600 hours) by employing minimum one ITI qualified with 3 years experience or SSC passed with 5 years experience FGM per shift for water supply bore well installation and booster pump installation at NCC OTA, station road having 02 Nos (01 No as standby) of 17.5 HP, 3 phase, 415 volts submersible motor pump set at bore well and 02 Nos pumping set (01 No as standby) of 17.5 HP, 3 phase 415 volts induction motor, centrifugal pumping set at Booster pump, electrical contrtol panel, electrical fittings, connected pipes/fittings with installation including repair /rectification of fault developed in the installation and upkeep the installation operational & working conditions, maitain day to day record of maintenance activities in log sheet etc. complete all as specified and directed including the following:- (a) Operation of control valves (sluice valve/gate valve) for control of water for different area as per the time schedule given by the Engineer-in-charge. (b) Maintenance of all machines and equipments installed within the installation boundary and keeping them serviceable/clean and ready condition including periodical maintenance and all repair to motor, pump, pipe fitting, starter panels and accessories as required and directed by Engineer-in-Charge. (c) Operation and maintenance of chlorination plant and control valves as per time schedule given by Engineer-in -Charge for supply of cholrinated water to user destination with minimum 0.2 PPM at users end. (d) It will be the responsibility of the contractor to provide trade's man with T&P to change all the burnt out, unserviceable changeover switches, panel, motor starter & other accessies as directed by Engineer-in-Charge.
Out sourcing of M&O in two shifts ( i.e. 16 hours in two shifts, each shift of 8 hours i.e. Ist shift from 0600 Hours to 1400 hours and 2nd shift 1400 hours to 2200 hours ) by employing minimum one ITI qualified with 3 years experience or SSC passed with 5 years experience FGM per shift for water supply bore well installation and booster pump installation at NCC Kampoo having 02 Nos (01 No as standby) of 17.5 HP, 3 phase, 415 volts submersible motor pump set at bore well and 02 Nos pumping set (01 No as standby) of 17.5 HP, 3 phase 415 volts induction motor, centrifugal pumping set at Booster pump, electrical contrtol panel, electrical fittings, connected pipes/fittings with installation including repair /rectification of fault developed in the installation and upkeep the installation operational & working conditions, maitain day to day record of maintenance activities in log sheet etc. complete all as specified and directed including the following:- (a) Operation of control valves (sluice valve/gate valve) for control of water for different area as per the time schedule given by the Engineer-in-charge. (b) Maintenance of all machines and equipments installed within the installation boundary and keeping them serviceable/clean and ready condition including periodical maintenance and all repair to motor, pump, pipe fitting, starter panels and accessories as required and directed by Engineer-in-Charge. (c) Operation and maintenance of chlorination plant and control valves as per time schedule given by Engineer-in -Charge for supply of cholrinated water to user destination with minimum 0.2 PPM at users end. (d) It will be the responsibility of the contractor to provide trade's man with T&P to change all the burnt out, unserviceable changeover switches, panel, motor starter & other accessies as directed by Engineer-in-Charge.
Description all as per item No 2 here-in-before but at 42 Med Regt (Pump House). NOTE for item No 1 to 3 :- Quoted rates deemed to be inclusive for the following :- (a) Area cleaning including cutting of grass etc upto 3 Mtrs from the plinth protection all around plants rooms and it should be ready for insp at any time (b) Daily check as per manufacturers manual before starting the machine. (c) Any abnormality observed be immediately intimated to the JE E/M or AGE E/M. (d) Reqd tools to be always available with the operator and will be provided by contractor. (e) Log sheet to be maintained regularly in binding book, month wise all as directed by Engr-in-Charge. (f) First aid box including medicines shall always be kept in the installation and will be provided by the contractor. (g) Preparation and display of duty charts/ posters neately all as directed (h) Cost of uniform as approved by the Engr-in-Chrage/GE and operators shall always be in proper uniform (j) Max duty hours of one operator will not be increase by more than 08 hours in any case (k) Min repair of line ( Mtrl & labour for replacing of rubber gasket, packing of gland, replacing of nuts and bolts) to be carried out by the contractor without any extra cost to run the installation smoothly.
Description all as per item No. 1 above but at new MH Gwalior. The pump operator have to operate and man the following :- (a) DG set of 400 KVA capacity installed at premises of New MH Gwalior, (b) 63 KVA DG Set installed for pump House, (c) Fire fighting pump house with its all three pumps i.e. electric driven centrifugal pump of 60 HP capacity, Diesel driven centifugal pump of 60 HP Capapcity and jockey pump of 15 HP Capacity (d) 02 Nos 20 HP Centrifugal pump installed for new MH Gwalior and (e) one borewell installed in the premises of old MH Gwalior. The operator have to supply the water as per direction of Engr-in- Charge to new MH as well as old MH and have to maint log sheets with respect to all eqpts as mentioned above.
Outsoutcing of Manning and operation in one shift (i.e 08 hrs in one shift from 0600 hrs to 1400 hrs) by employing one FGM (having experience of min 03 yrs with ITI qualified or 05 yrs experience with SCC) for operator of control valves ar Para Hill UG sump to supply/receive the water.
M/s Sagar Construction
m/s yadav builders
G M CONSTRUCTION COMPANY
BRIJ MOHAN LAL AND CO.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .