| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹34.5 LAccepted-AOC | 1 | Accepted-AOC Acceptec | |
| 2 | 2₹33.0 L+₹19,904.34 (0.61%)Rejected-Finance | 2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | R SHANDUKHAN L1 | T SELVAMANI L2 |
|---|---|---|---|---|---|
| 1.00Name of the work : 1. Providing Renewal BT at Anamalaipatti road, H/O Sirugudi (R-107) Estimate Amounts :33.50 Lakhs. | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 2,427.12 | Sqm | 6 ₹14,562.72 Lowest | 10 ₹24,271.2 |
| 3.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 910.17 | cum | 140 ₹1,27,423.8 Lowest | 145 ₹1,31,974.65 |
| 4.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 202.26 | cum | 341.01 ₹68,972.68 Lowest | 341.01 ₹68,972.68 Lowest |
| 5.00Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal | |||||
| 6.00 | KM 0/0 - 1/000 | 57.45 | cum | 5,080 ₹2,91,846 Lowest | 5,080 ₹2,91,846 Lowest |
| 7.00 | KM 1/000 - 1/700 | 31.75 | cum | 5,090 ₹1,61,607.5 Lowest | 5,100 ₹1,61,925 |
| 8.00 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat | 6,406.25 | Sqm | 34.67 ₹2,22,104.69 Lowest | 35 ₹2,24,218.75 |
| 9.00BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | |||||
| 10.00 | KM 0/0 - 1/700 | 160.16 | CUM | 11,641.8 ₹18,64,550.69 Lowest | 11,641.8 ₹18,64,550.69 Lowest |
Tender Value
₹33.5 L
EMD Value
₹34,000
Closing Date
19 Feb 2026, 3:00 pmClosed
Block Development Officer (BP), Natham
Block Development Office, Natham
Providing Renewal BT road at Anamalaipatti road in Km 0/0-1/700
2026_RDTN_657498_1
TN-05-140-Rural road maintainence scheme 2025-26
Open Tender
Civil Works - Roads
Works
Natham
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹34,000
Yes
25 Feb 2026
14 Feb 2026
19 Feb 2026
14 Feb 2026
19 Feb 2026
14 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Name of the work : 1. Providing Renewal BT at Anamalaipatti road, H/O Sirugudi (R-107) Estimate Amounts :33.50 Lakhs. | - | - | - | - |
| 2 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 2,427.12 | Sqm | - | - |
| 3 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 910.17 | cum | - | - |
| 4 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 202.26 | cum | - | - |
| 5 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal | - | - | - | - |
| 6 | KM 0/0 - 1/000 | 57.45 | cum | - | - |
| 7 | KM 1/000 - 1/700 | 31.75 | cum | - | - |
| 8 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat | 6,406.25 | Sqm | - | - |
| 9 | BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | - | - | - | - |
| 10 | KM 0/0 - 1/700 | 160.16 | CUM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.42 MB
Tendernotice_2.pdf
PDF • 0.54 MB
BOQ_788626.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .