Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹39.8 L+₹1.1 L (2.77%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical Documents incomplete | |
| 4 | Rejected-Technical ADHA JALLIM MAINPURI PHATAK ETAWAH | - | Rejected-Technical Documents incomplete |
Tender Value
₹39.9 L
EMD Value
₹79,780
Closing Date
12 Feb 2019, 5:00 pmClosed
SE ICC MAHOBA
Office of the SE ICC, BAJARIYA MAHOBA
Construction of V.R.B. at km. 40.800 of Kabrai Main Canal.(LOT-15)
2019_UPIDC_302649_15
08/SE/2018-19
Open Tender
Civil Works
Item Rate
180 days
MAHOBA
AS PER NIT AND TENDER DOCUMENT
2 documents required · 2 mandatory
₹2,354
EE IRRIGATION CONSTRUCTION DIVISION
₹79,780
Yes
24 May 2021
6 Feb 2019
14 Feb 2019
6 Feb 2019
12 Feb 2019
6 Feb 2019
Amount
The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work. GST will be paid after the deduction of 4% VAT.
Excavation of foundation in all type of strata excluding hard rock including disposal with all leads, lifts & T&P etc for proper completion of job as per direction of Engineer-in-Charge , including all tax like Income tax, Labour cess etc but excluding G.S.T.
Laying A-40 M-10 C.C. 1:3:6 by mechanical mixing and mechanical vibration. Cement consumption of 4.30 bags per cum including cost of all material, labour and T&P all leads and lifts for proper completion of job as per direction of Engineer-in-charge , including all tax like Income tax, Labour cess etc but excluding G.S.T.
Laying A-40 M-20 C.C. 1:1.5:3 by mechanical mixing and mechanical vibration. Cement consumption of 7.90 bags per cum including cost of all material, labour and T&P all leads and lifts for proper completion of job as per direction of Engineer-in-charge, including all tax like Income tax, Labour cess etc but excluding G.S.T.
Laying A-20 M-25 C.C. 1:1:2 (M-25) by mechanical mixing and mechanical vibration. Cement consumption of 7.90 bags per cum including cost of all material, labour and T&P all leads and lifts for proper completion of job as per direction of Engineer-in-charge , including all tax like Income tax, Labour cess etc but excluding G.S.T.
Providing & fixing Centering & shuttering for R.C.C. work with all cost of labour material T&P etc. with all leads and lifts for proper completion of job as per direction of Engineer-in-charge , including all tax like Income tax, Labour cess etc but excluding G.S.T.
Providing & Laying Steel reinforcement for R.C.C. work including cost of steel cutting, bending, placing in position binding with G.I. wire and welding etc including cost of all material T&P and all leads and lifts for proper completion of job as per direction of Engineer-in-charge , including all tax like Income tax, Labour cess etc but excluding G.S.T.
Supplying & fixing joint filler board 20mm including cost of material, labour, T&P etc with all lead & lifts for proper completion of job as per direction of Engineer-in-charge , including all tax like Income tax, Labour cess etc but excluding G.S.T.
Making weep holes in upstream and downstream wing wall including filling with filter material with all material, labour and T&P etc for proper completion of job as per direction of Engineer-in-charge , including all tax like Income tax, Labour cess etc but excluding G.S.T.
Providing & Fixing wheel guard including cost of labour T&P etc required for proper completion of work , including all tax like Income tax, Labour cess etc but excluding G.S.T.
M/s Radha Krishna Shukla Contractor
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .