Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L1₹3.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L1₹3.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L1₹3.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L1₹3.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.4 L
EMD Value
₹3,363
Closing Date
14 Aug 2026, 5:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION NO.II, BALASORE
S/R to Kitchen block of R.I.Office at Jamjhadi_building for 2026-27 - 42/6646
2026_CERWI_137378_1
E-TCN No.04 of 2026-27-3
Open Tender
Civil Works - Buildings
Percentage
30 days
Balasore
2 documents required · 2 mandatory
₹2,000
₹3,363
Yes
20 Aug 2026
1 Aug 2026
17 Aug 2026
1 Aug 2026
14 Aug 2026
1 Aug 2026
1 Aug 2026 - 13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil up to required depth with levelling the bed etc complete. | 1 | Cum | 282.89 | ₹282.86 |
| 2 | Filling foundation and plinth with sand well watered and rammed including cost conveyance royalty of sand and labour etc complete. | - | Cum | 1,254 | - |
| 3 | P.C.C.(1:3:6) in foundation and plinth with 4cm. size h.g. metal including cost carriage etc cos labour T&P etc complete. | - | Cum | 6,428.03 | - |
| 4 | Cement Concrete (1:1.5:3) with 20 mm size & down graded h.g. chips including cost, conveyance, royality and all labour charges etc complete as per the direction of the E.I.C | - | Cum | 8,066.2 | - |
| 5 | R.C.C. of M-20 grade with 20 mm & down graded size h.g. c.b. chips with cost carriage royalty of all materials etc.complete.Plinth Beam | - | Cum | 8,157.46 | - |
| 6 | Supplying, fitting and placing HYSD FE-500 tor steel bar reinforcement complete as per drawing and technical specification | - | Qtl | 8,615.63 | - |
| 7 | Flyash brick masonry in cement mortar ( 1:6 ) in fnd.& plinth cost, carriage, royalty etc. complete.In foundation | 1 | Cum | 5,935.03 | ₹5,934.44 |
| 8 | Flyash brick masonry in cement mortar ( 1:6 ) in fnd.& plinth cost, carriage, royalty etc. complete.Superstructure | - | Cum | 5,968.36 | - |
| 9 | Fixing G.C.I. sheet in roof drilling hole in wind ties including fixing of ridges valleys wind ties etc.excluding cost of fitting but including cost of all materials etc. | - | Sqm | 587.56 | - |
| 10 | Galvanised Iron work wrought and put up in trusses and record racks including cost of materials labour for fabricating, fitting and fixing of proper position etc…complete | - | Kg | 164.15 | - |
stage.html
html • 0.07 MB
finance_603745.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_3.pdf
PDF • 0.64 MB
Tendernotice_2.pdf
PDF • 2.21 MB
Tendernotice_1.pdf
PDF • 1.39 MB
BOQ_603745.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .