Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
8 Mar 2021, 6:00 pmClosed
Er. Bir Singh
Executive Engineer TCC Division Jammu
Construction of flair wall down stream of devak syphon of Main Ravi Canal RD 84015
2021_IFC_118108_4
e-NIT No 31 of 2020-21
Open Tender
Civil Works
Item Rate
30 days
Construction of flair wall down stream of devak sy
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
Convener, purchase committee, Directorate of ISM
Exempted
9 Mar 2021
24 Feb 2021
9 Mar 2021
25 Feb 2021
8 Mar 2021
25 Feb 2021
Amount
Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 mtr lead. In cement mortar.
Extra for every additional lift of 1.5M or part there of in All kind of soil
2nd lift
3rd lift
4th lift
P/L in position cement conc. of specified grade excluding the cost of centering and shuttering. All work upto plinth level.
1:4:8 ( 1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size ) crushed.
1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size ) crushed
Dumping stone excluding cost of stones in Horizontal on level
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns ,piers abutments, pillars posts struts buttresses, string or laces, courses, parapets coping ,bed blocks ,anchor blocks plan window sills, sunken floor fillets etc upto floor v level excluding the cost of centering shuttering and finishing in 1:2:4 ( 1 cement 2 coarse sand : 4 graded stone aggregate 20mm nominal size ) crushed
12mm cement plaster of mix 1:4 (1 cement: 4 coarse sand).
Centering and shuttering including strutting propping etc and removal of form for :
Foundation, Footing, bases of columns etc for mass concrete
Walls any thickness including attached pilasters buttresses plinth and string course etc.
Supply of stones Supply of stone boulder (nallah) nominal size 225MM (stack measurement reduced by 15%)
Filling available excavated earth (excluding rock in trenches plinth sides of foundations etc layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering lead upto 50 M and lift upto 1.5 m .Deduct for not watering the excavated earth for banking.
Earth work in rough excavation banking excavated earth in layers not exceeding 20 Cm in depth, breaking clods, watering, rolling each layer with half tonne roller or wooden or steel rammer and rolling every third and top most layer with power roller of minimum 8 tonne and dressing up in embankments for roads flood banks marginal banks and guide or filling up gro und depressions lead upto 50 m and lift upto 1.5 m . All kinds of s oil.Deduct for not rolling with power roller of min 8 tonne for banking excavated earth in layer not exceeding 20 Cm in depth. Deduct for not watering the excavated earth for banking .
Carriage of material by Mechanical transport from source to site of work including loading unloading and stacking
Sand and agg average distance 10 Km and by head load 100M
Soling stone average distance 10 Km
Earth average distance 3 Km
Ravi Kant Verma
Sodagar Mal Govt Contractor
DEEPAK BANOTRA GOVT CONTRACTOR
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .