Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.5 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹5.0 L+₹56,652.20 (12.7%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹5.1 L+₹66,389.29 (14.9%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹5.5 L+₹99,141.34 (22.2%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹6.2 L+₹1.7 L (38.6%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹8.8 L
EMD Value
₹17,700
Closing Date
20 Jun 2026, 4:00 pmClosed
Executive Engineer
Executive Engineer PWD RnB Division Marwah
REPAIR OF 54 MTR WODDEN SUSPENSION BRIDGE AT PASSER MARWAH
2026_PWDJK_311758_2
e-NIT No.07 of 2026-27 dated 06-06-2026
Open Tender
Civil Works
Percentage
30 days
Marwah
REPAIR OF 54 MTR WODDEN SUSPENSION BRIDGE AT PASSER MARWAH
2 documents required · 2 mandatory
₹600
Executive Engineer PWD RnB Division Marwah
₹17,700
Executive Engineer PWD RnB Division Marwah
2 Jul 2026
6 Jun 2026
20 Jun 2026
6 Jun 2026
20 Jun 2026
6 Jun 2026
9 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth asdirected:50 meter beyond | |||||
| 1.01 | All kind of soil | 0.47 | Cum | 479.3 | ₹225.27 |
| 1.02 | Ordinary Rock | 0.2 | Cum | 924.8 | ₹184.96 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 0.23 | Cum | 5,202.9 | ₹1,196.67 |
| 3 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 4.5 | Cum | 5,733.6 | ₹25,801.2 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for:
Columns, piers, abutments, pillars, posts and struts | 12 | Sqm | 723.2 | ₹8,678.4 |
| 5 | Dismantling wood work in frames, trusses, purlins and rafters upto 10
meters span and 5 meters height including stacking the material within 50
meters lead : Of sectional area 40 sqcm. and above. | 8.14 | Cum | 3,488.65 | ₹28,397.61 |
| 6 | Providing beams including hoisting, fixing in position and applying wood preservative for the unexposed surfaces, etc. complete with :Second class kail wood | 8.14 | Cum | 88,497.8 | ₹7,20,372.09 |
| 8 | Providing and fixing mild steel round holding down bolts with nuts andwasher plates complete. | 100 | Kg | 96 | ₹9,600 |
| 9 | Providing and fixing bolts including nuts and washers complete. | 100 | Kg | 131.2 | ₹13,120 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
BOQ_1009301.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .