Executive Engineer, ED-3rd srinagar
Office of Executive Engineer, ED-3rd srinagar
Creation of 100 KVA Substation along with HT/LT Network behind Mughal Darbar Mustafafabad Lane no. 04 to be fed from feeder no. 4 of Receiving Station Zainakote pertaining to ESD Zainazokte, ED 3rd (Turnkey Basis)
2021_PDD_146080_1
ED-III /51 of 2021-22, Dated - 01-11-2021
Open Tender
Electrical Works
Turn-key
15 days
Office of Executive Engineer, ED-3rd srinagar
Refer SBD, Technical Specification, Drawings
6 documents required · 6 mandatory
₹500
Executive Engineer, ED-3rd srinagar
Exempted
13 Dec 2021
1 Nov 2021
11 Dec 2021
1 Nov 2021
9 Dec 2021
5 Nov 2021
2 Nov 2021 - 9 Dec 2021
Amount
Creation of 100 KVA Substation along with HT/LT Network behind Mughal Darbar Mustafafabad Lane no. 04 to be fed from feeder no. 4 of Receiving Station Zainakote pertaining to ESD Zainazokte, ED 3rd (Turnkey Basis)
Supply, Installation, testing and commissioning including transportation, loading and unloading of 100 KVA,11/0.433,3 phase Distribution Transformers with Bimetallic Terminal Connectors Energy efficient Level-2, (Aluminum wound) as per IS 1180 Part-I of 2014 and with LV Cable Box having detachable Aluminium Gland plate. (Contractor shall ensure the Manufacturer is BIS Approved) (As per the Specifications enclosed)
Supply, installation, testing and commissioning including transportation, loading and unloading of Gapless Surge Arrestor, 9 KV, 10 KA, Lighting Arrestor Set Heavy duty with Polymer Housing, Station type conforming to IEC-99-4 Capable of withstanding Maximum continuous operating voltages (M.C.O.V)(As per the Specifications enclosed)
Supply, installation, testing and commissioning including transportation, loading and unloading of 11KV 200 Amperes, Triple pole switches Gang Operated (G.O. Set) conforming: IS-2544, IS: 5340 (Part-III) and SS: 9921 (Part-I -V) (As per the Specifications enclosed)
Supply, installation, testing and commissioning including transportation, loading and unloading of 11 KV Horn, Gap (fuse 3-phase 200A) as per Relevant IS. (As per the Specifications enclosed)
Supply, installation, testing and commissioning including transportation, loading and unloading of 185 mm² Cable, 1.1kV Grade, PVC Insulated Stranded Conductor FRLS type. (Havells, Polycab, Gloster, 3M, paramount/equivalent make). (As per the Specifications enclosed)
Supply, Installation, Testing & Commissioning including Transportation, loading Unloading including digging/excavation up 1.5 meter deep for planting of S.T. poles 9.0 Meter long swaged Type conforming to ST 410 SP-33, IS: 2713 amended up-to date well finished and coated with black bituminous paint upto plant depth and Red-Oxide coated above ground level with earthing arrangement through bolt welded on pole of 14mm diameter, provided at height of 300 mm above the planting depth which should be 1.5ms (SP 33). Top plate 3mm thick fully welded & bottom plate 35cm*35cm, 5mm thick fully welded. (As per the Specifications enclosed)
Supply, fabrication and fixing including Transportation, loading Unloading of of G.I Channel Iron / Angle Iron /Flat of sizes including clamps/collars 50 x 6 mm (As per the Specifications enclosed)
Supply and fixing of GI Nuts and Bolts full thread of sizes Galvanized as per IS (As per the Specifications enclosed)
Supply, laying, testing and commissioning of Earthing of Substation-Excavation of earth pit of dia 650mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as per IS 1239. GI strip for neutral earthing of size 25mm*3mm for connection of transformer body, G.O Set & lightening Arrestor as per IS 2629/85, GI nuts & bolts, refilled with earth enhancement materials & earth chamber made of brick masonry with RCC slab cover. (As per the Specifications enclosed)
Supply, Installation, Testing and Commissioning including Transportation, loading Unloading of 11KV Pin Insulators (Polymer Type) 12 KV, 5KN Complete with fittings (Lighting Impluse 75 KV positive and 80 KV negative, crepage distance 320 mm) (As per the Specifications enclosed)
Supply, Installation, Testing and Commissioning including Transportation, loading Unloading of 11KV Disc Insulators (Polymer Type) 12 KV, 45KN Complete with fittings (Lighting Impluse 75 KV positive and 80 KV negative , crepage distance 320 mm) (As per the Specifications enclosed)
Supply, Laying, Erection, testing and Commissioning of 50 Sqmm ACSR including Loading/Unloading/Carriage from Divisional Store to the Site (As per the Specifications enclosed)
Supply and fixing of Sundry items like aluminium lugs, Jumpers, binding Tape, SL Clamps, Baby insulators of appropriate sizes and ratings required for commissioning of Substation (As per the Specifications enclosed)
Supply and fixing of Danger Plate With Clamps as per Standards wih writing in English & Urdu. (As per the Specifications enclosed)
Supply, Installation/fixing, Testing & Commissioning of LT Distribution Box for 100 KVA DTR with TPN MCCB for incomer & SFU's for Outgoing Circuits (As per the Specifications enclosed)
Supply and fixing of Wedge Connectors/PG Clamps (As per the Specifications enclosed)
Supply and fixing of Anti Climbing devices(GI Barbed Wire (12 SWG) for a distnce of 40 CM at hight of 3.5 meters from GL) , 3.50 Kg per pole. With clamps (As per the Specifications enclosed)
Supply and fixing of Anti-Climbing Device with Clamps (As per the Specifications enclosed)
Supply, Installation, testing and commissioning including transportation, loading and unloading of S.T. poles 8.0 Meter long swaged Type conforming to ST 540 SP-15 , IS: 2713 amended up-to date well finished and coated with black bituminous paint upto plant depth and Red-Oxide coated above ground level with earthing arrangement through bolt welded on pole of 14mm diameter, provided at height of 300mm above the planting depth which should be 1.5ms (SP 15).Top plate 3mm thick fully welded & bottom plate 35cm*35cm, 5mm thick fully welded. (As per the Specifications enclosed)
Supply, installation, testing and Commissioning of 16 KN Polymer Shackle Insulators (As per the Specifications enclosed)
Supply and Fixing of GI U-Clamps for Shackle Insulators (As per the Specifications enclosed)
Supply, installation, testing and Commissioning of Pole Earthing Complete by GI Pipe 40 mm or GI Rod 20mm 2.5 mtr long through GI Strip(25x3mm) (As per the Specifications enclosed)
Providing of material and laying of Cement bottoming of poles (1:2:4 Mix as per REC Standards 0.5M3 per Pole)(As per the Specifications enclosed)
Providing of material and laying of Cement bottoming of poles (1:2:4 Mix as per REC Standards 0.45M3 per Pole) (As per the Specifications enclosed)
Providing and Painting of ST Poles with one coat of Red Oxide Primer
Providing and Painting of ST Poles with two coats of Aluminum Paint
M/s JB ELECTRICALS
M/S FAROOQ AHMAD MIR
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .