| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.1 LAccepted-Finance | L1 | Accepted-Finance Being lowest | |
| 2 | L2₹22.1 L+₹4.0 L (21.8%)Accepted-Finance 112 AMBALA ROAD NARAINGARH AMBALA 134203 | NARAINGARH | AMBALA | HARYANA | 134203 | L2 | Accepted-Finance Not being lowest | |
| 3 | L3₹22.4 L+₹4.3 L (23.7%)Accepted-Finance | L3 | Accepted-Finance Not being lowest | |
| 4 | L4₹25.2 L+₹7.0 L (38.9%)Accepted-Finance PLOT NO 10 9 OM VIHAR PHASE 1 A UTTAM NAGAR NEW DELHI 110059 | WEST DELHI | DELHI | 110059 | L4 | Accepted-Finance Not being lowest | |
| 5 | L5₹28.0 L+₹9.9 L (54.6%)Accepted-Finance WZ 143 A 7A S 4 43 GALI NO 2 OLD MAHAVIR NAGAR NEW DELHI 110018 | WEST DELHI | DELHI | 110018 | L5 | Accepted-Finance Not being lowest |
| Sl No | Description | Qty | Unit | M/S ANIL KUMAR L6 | a.k constructions L1 | J S CONSTRUCTION CO L2 | Lamba Enterprises L4 | M/S Sunil Steel Works L5 | yameen enterprises L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches n exc 1.5m wide and n exc 1.50m in depth for foundation etc and getting out in Hard dense Soil complete all as specified.Note; Most of the Excavation will be done manually and no extra cost will be paid to contractor seperately for manual excavation. If any UG Cables, Pipes are damaged during excavation,entire cost for restoration will be borne by the contractor | 60 | CUM | 819 ₹49,140 | 200 ₹12,000 Lowest | 400 ₹24,000 | 450 ₹27,000 | 500 ₹30,000 | 250 ₹15,000 |
| 2.00 | Excavation in trenches inany type of Hard dense soil not exc 1.5m wide and exc 1.50 mtr but not exc 3.00 mtr in depth for foundation etc and getting out in hard dense soil complete all as specified.Note; Most of the Excavation will be done manually and no extra cost will be paid to contractor seperately for manual excavation. If any UG Cables, Pipes are damaged during excavation,entire cost for restoration will be borne by the contractor | 30 | CUM | 3,179 ₹95,370 | 250 ₹7,500 Lowest | 700 ₹21,000 | 550 ₹16,500 | 700 ₹21,000 | 350 ₹10,500 |
| 3.00 | Excavation in trenches in any type of Hard dense soil not exc 1.5m wide and exc 1.50 mtr but not exc 4.50 mtr in depth for foundation etc and getting out in hard dense soil complete all as specified.Note; Most of the Excavation will be done manually and no extra cost will be paid to contractor seperately for manual excavation. If any UG Cables, Pipes are damaged during excavation,entire cost for restoration will be borne by the contractor | 15 | CUM | 3,999 ₹59,985 | 300 ₹4,500 Lowest | 900 ₹13,500 | 550 ₹8,250 | 1,000 ₹15,000 | 450 ₹6,750 |
| 4.00 | Returning filling in, incl spreading levelling watering and well ramming in layers n exc 25cm (after the pipes have been laid and tested) in soft/loose/disintegrated soil or rocks complete all as specified. | 20 | CUM | 79 ₹1,580 | 50 ₹1,000 Lowest | 150 ₹3,000 | 100 ₹2,000 | 200 ₹4,000 | 90 ₹1,800 |
| 5.00 | Removing excavated materials to a distance exc 1.50 Km but not exc 5 Km outside defence land and depositing where directed. | 20 | Cum | 999 ₹19,980 | 700 ₹14,000 | 90 ₹1,800 Lowest | 120 ₹2,400 | 400 ₹8,000 | 90 ₹1,800 Lowest |
| 6.00 | M&L for cement concrete 1:3:6 type C-2 using 40mm graded aggregates for bedding layers laid (SN8) 180(OD)/163(ID) mm internal dia DWCPE pipes after they are laid and tested complete all as specified (thickness of concrete bed 100 mm). | 900 | RM | 169 ₹1,52,100 | 150 ₹1,35,000 | 300 ₹2,70,000 | 200 ₹1,80,000 | 250 ₹2,25,000 | 90 ₹81,000 Lowest |
| 7.00 | S&F DWCPE(SN8) 180(OD)/163(ID) mm dia pipes and Snap fit/ Push fit coupler with rubber ring/ gasket for joining incl testing and laid and properly jointed laid in trenches to a level on concrete bed complete all as specified. | 900 | RM | 869 ₹7,82,100 | 500 ₹4,50,000 Lowest | 500 ₹4,50,000 Lowest | 540 ₹4,86,000 | 750 ₹6,75,000 | 700 ₹6,30,000 |
| 8.00 | M&L for cement concrete 1:3:6 type C-2 using 40mm graded aggregates for bedding layers laid DWCPE(SN8) 200(OD)/175(ID) pipes after they are laid and tested complete all as specified (thickness of concrete bed 150mm). | 800 | RM | 119 ₹95,200 | 160 ₹1,28,000 | 250 ₹2,00,000 | 200 ₹1,60,000 | 300 ₹2,40,000 | 90 ₹72,000 Lowest |
| 9.00 | S&F DWCPE(SN8) 200(OD)/175(ID) mm dia pipes and Snap fit/ Push fit coupler with rubber ring/ gasket for joining incl testing and laid and properly jointed laid in trenches to a level on concrete bed complete all as specified. | 800 | RM | 899 ₹7,19,200 | 600 ₹4,80,000 Lowest | 600 ₹4,80,000 Lowest | 650 ₹5,20,000 | 950 ₹7,60,000 | 799 ₹6,39,200 |
| 10.00 | M&L PCC 1 : 4 : 8 type D2 using 40mm graded stone aggregates as in foundation of manholes, posts etc complete all as specified. | 8 | CUM | 1,009 ₹8,072 Lowest | 3,000 ₹24,000 | 2,900 ₹23,200 | 2,500 ₹20,000 | 2,400 ₹19,200 | 4,000 ₹32,000 |
Tender Value
₹43.7 L
EMD Value
₹87,380
Closing Date
29 Jun 2026, 6:00 pmClosed
LT COL MANISH E WASNIK
GE (CENTRAL) DELHI CANTT-10
8826/TOKEN-07/2026-27
2026_MES_769116_1
GE/TOKEN-07/2026-27
Open Tender
Civil Works
Item Rate
180 days
GE (CENTRAL) DELHI CANTT-10
AS PER NIT
9 documents required · 9 mandatory
₹500
Yes
GE (CENTRAL) DELHI CANTT-10
₹87,380
Yes
7 Jul 2026
2 Jun 2026
1 Jul 2026
2 Jun 2026
29 Jun 2026
15 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches n exc 1.5m wide and n exc 1.50m in depth for foundation etc and getting out in Hard dense Soil complete all as specified.Note; Most of the Excavation will be done manually and no extra cost will be paid to contractor seperately for manual excavation. If any UG Cables, Pipes are damaged during excavation,entire cost for restoration will be borne by the contractor | 60 | CUM | - | - |
| 2 | Excavation in trenches inany type of Hard dense soil not exc 1.5m wide and exc 1.50 mtr but not exc 3.00 mtr in depth for foundation etc and getting out in hard dense soil complete all as specified.Note; Most of the Excavation will be done manually and no extra cost will be paid to contractor seperately for manual excavation. If any UG Cables, Pipes are damaged during excavation,entire cost for restoration will be borne by the contractor | 30 | CUM | - | - |
| 3 | Excavation in trenches in any type of Hard dense soil not exc 1.5m wide and exc 1.50 mtr but not exc 4.50 mtr in depth for foundation etc and getting out in hard dense soil complete all as specified.Note; Most of the Excavation will be done manually and no extra cost will be paid to contractor seperately for manual excavation. If any UG Cables, Pipes are damaged during excavation,entire cost for restoration will be borne by the contractor | 15 | CUM | - | - |
| 4 | Returning filling in, incl spreading levelling watering and well ramming in layers n exc 25cm (after the pipes have been laid and tested) in soft/loose/disintegrated soil or rocks complete all as specified. | 20 | CUM | - | - |
| 5 | Removing excavated materials to a distance exc 1.50 Km but not exc 5 Km outside defence land and depositing where directed. | 20 | Cum | - | - |
| 6 | M&L for cement concrete 1:3:6 type C-2 using 40mm graded aggregates for bedding layers laid (SN8) 180(OD)/163(ID) mm internal dia DWCPE pipes after they are laid and tested complete all as specified (thickness of concrete bed 100 mm). | 900 | RM | - | - |
| 7 | S&F DWCPE(SN8) 180(OD)/163(ID) mm dia pipes and Snap fit/ Push fit coupler with rubber ring/ gasket for joining incl testing and laid and properly jointed laid in trenches to a level on concrete bed complete all as specified. | 900 | RM | - | - |
| 8 | M&L for cement concrete 1:3:6 type C-2 using 40mm graded aggregates for bedding layers laid DWCPE(SN8) 200(OD)/175(ID) pipes after they are laid and tested complete all as specified (thickness of concrete bed 150mm). | 800 | RM | - | - |
| 9 | S&F DWCPE(SN8) 200(OD)/175(ID) mm dia pipes and Snap fit/ Push fit coupler with rubber ring/ gasket for joining incl testing and laid and properly jointed laid in trenches to a level on concrete bed complete all as specified. | 800 | RM | - | - |
| 10 | M&L PCC 1 : 4 : 8 type D2 using 40mm graded stone aggregates as in foundation of manholes, posts etc complete all as specified. | 8 | CUM | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
BOQ_861319.xls
BOQ • 0.31 MB
tenderpage.pdf
Tender Documents • 0.97 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .