Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.7 LAccepted-Finance BADIYAR A PO NANDPUR TEHSIL JUBBAL DISTT SHIMLA H P | JUBBAL | SHIMLA | HIMACHAL PRADESH | ₹15.7 L | L1 | Accepted-Finance OK |
| 2 | L2₹15.8 L+₹5,348 (0.34%)Rejected-Finance | ₹15.8 L+₹5,348 (0.34%) | L2 | Rejected-Finance OK |
Tender Value
₹15.3 L
EMD Value
₹30,600
Closing Date
23 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER
HPPWD Jubbal
R/R damages on Annu Shillar road Km 0/00 to 12/000 SH-C/O B/wall at Rd 9/810 to 9/844 and R/wall at Rd 9/525 to 9/545, 9/795 to 9/815
2026_PWD_141397_2
E-Tender-2026-27-6155-58,Dated 17.08.2026
Open Tender
Civil Works
Percentage
Shillar
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
₹30,600
29 Aug 2026
18 Aug 2026
24 Aug 2026
18 Aug 2026
23 Aug 2026
18 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a any lead and lift , dressing of sides and bottom and backfilling in trenches with excavated suitable material.useful material available from excavation to be properly stacked and handed over to the department free of cost including all leads and lifts, as per HPPWD, specification of 1990 volume-I or as directed by the Engineer-In-Charge | 202.7 | Per Cubic metre | 490 | ₹99,323 |
| 2 | Providing and laying concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802,803,1202 and 1203.(1:6:12) | 25.24 | Per cubic metre | 4,600 | ₹1,16,104 |
| 3 | Random rubble masonrystone masonry(un-coursed/brought to courses)with hard stone of approved quality in foundation in cement mortar 1:6(1cement:6sand) complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203.including all leads and lifts, or as per HPPWD,. Specification of 1990 Volume-I, asdirected by the Engineer-In-Charge. | 272.42 | Per cubic metre | 4,550 | ₹12,39,511 |
| 4 | Backfilling with Granular material behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 including all leads and lifts, as per HPPWD, specification of 1990 volume-I or as directed by the Engineer-In-Charge | 50.4 | Per cubic metre | 1,450 | ₹73,080 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_209897.xls
BOQ • 0.23 MB
sbd.pdf
Tender Documents • 2.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .