| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical Condition Not Qualified |
| 4 | Rejected-Technical | Rejected-Technical Condition Not Qualified |
| 5 | Rejected-Technical | Rejected-Technical Condition Not Qualified |
Tender Value
Refer Docs
EMD Value
₹4,250
Closing Date
29 Apr 2022, 4:00 pmClosed
Superintending Engineer (D-2) Trans Gomti, LESA, L
33/11 KV Sub Station Mantri Awas, Gomtinagar ,Lucknow.
Execution work of Testing of Protective System of 33/11 KV System of Various Power Transformer and Switch gear, in the area Division-Chinhat, under the Jurisdiction of EUTD-II, Gomtinagar, LESA Lucknow
2022_MVVNL_687418_1
04/EUDC-II/2022-23
Open Tender
Electrical Works
Fixed-rate
180 days
Division-Chinhat
As Per Tender Document
2 documents required · 2 mandatory
₹1,180
EE, EUTD II, Lesa, Lucknow
₹4,250
7 May 2022
13 Apr 2022
30 Apr 2022
13 Apr 2022
29 Apr 2022
13 Apr 2022
Amount
Laying and Jointing PVC Pipe. Heading
Testing of power Transformer and Earth resistive test in Chinhat at various 33/11 KV S/s Voltage Ratio testing at normal tap, oil test, magnetic balance at normal tap, oil test megar result calibration of WTI and OTI meter and earthing resistive test and other testing if any required and Testing of 33/11 KV Power Transformer Panel marshalling box & brakers by Primary Injection Method, Temperature, Oil Temperature, Oil level Indicator, buchholz relay, surge relay for alarm, tripping testing of relay.
Testing of 11 KV Panels & relay, 11 KV VCB/OCB (all make) setting of relay to avoid time overlapping, rectifying the faults in VCB/OCB for proper triping, testing the healthyness of control ckt and replacing the damage control ckt, ensuring complete and smooth operation of breakers, checking the healthyness of earthing of panels, testing proper buchholz operation, checking the healthyness of transformer. (Power) erathing (both neutral & body). Contractor will recify the faults in triping ckt, Testing and repairing of penels control ckt and relays all work will have one year warranty. During warranty period if and problem appear in tripping/protection ckt, contractor will rectified if mojor spare parts of VCB & relay will be provided by department (if replacement is required) petty item like nuts, and bolts, greasing etc. will be provided by the contractor.
PRITHVI ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .