| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAdmitted-Finance | ₹3.3 L | L1 | Admitted-Finance |
| 2 | L2₹4.0 LAdmitted-Finance | ₹4.0 L | L2 | Admitted-Finance |
| 3 | L3₹4.0 LAdmitted-Finance | ₹4.0 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S SHUBHAM ELECTRICAL L1 | DEEPAK ENGINEERING L2 | HARE KRISHNA ENERGY PROJECTS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Arresting of leakage and sepage in 10 MVA Power traansformer of 33/11 KV sub station New Alambagh-II, chander nager, Railwey Power House and Sampurnanad. Work Includes Opening of H.T. and L.T Side connection darining out of transormer and radiators, replacement of damage gaskit/cog sheet which will be provided by contractor fotting of Top and radiators with proper tightening of nut and bolts with copper L-Pies and welding proper connection of H.T. & L.T. Side with other assoclated work to complete the job nut bolt and other required material will be provided by contractor. | 4 | Job | 25,000 ₹1 L | 36,000 ₹1.4 L | 36,050 ₹1.4 L |
| 2.00 | Centifusing of Transformer Oil upto 70 KV BDV Valve | 2 | Job | 35,000 ₹70,000 | 40,600 ₹81,200 | 40,800 ₹81,600 |
| 3.00 | Supply and errection of silicagel Breather complete for 10 MVA Transformer. All meteral Provided by contractor. | 6 | Job | 5,900 ₹35,400 | 6,000 ₹36,000 | 6,100 ₹36,600 |
| 4.00 | Supply and errection of damage control cable of (4x2.5 Sqmm.) for WTI, OTI and Buchholz upto control pannel. All materal Provided by contractor. | 100 | Mtr. | 230 ₹23,000 | 240 ₹24,000 | 245 ₹24,500 |
| 5.00 | Supply and errection WTI & OTI, All meteral Provided by contractor. | 4 | No. | 8,400 ₹33,600 | 9,000 ₹36,000 | 9,100 ₹36,400 |
| 6.00 | Supply and errection Arching horn. All meteral will be Provided by contractor. | 20 | No. | 200 ₹4,000 | 206 ₹4,120 | 205 ₹4,100 |
| 7.00 | Supply and errection of Coppermess for 11 KV side connection Neutral. All meteral will be Provided by contractor. | 6 | No. | 1,400 ₹8,400 | 1,500 ₹9,000 | 1,490 ₹8,940 |
| 8.00 | Supply and errection of Copper L-Piece (Size 50 mmx10mmx200 mm) for 11 KV side of 10 MVA transformer. All meteral will be Provided by contractor. | 25 | No. | 2,200 ₹55,000 | 2,500 ₹62,500 | 2,450 ₹61,250 |
| 9.00GST Extra as per Rules | ||||||
Tender Value
₹3.3 L
EMD Value
₹3,350
Closing Date
25 Aug 2025, 5:00 pmClosed
SE-EUDC-VRINDAVAN, LUCKNOW.
33/11 KV SECTOR-5D, VRINDAVAN COLONY, LUCKNOW.
The work of Annual maintenance of the established power transformer at various 33/11 KV Sub Stations under the Electricity Urban Distribution Division Alambagh, Amausi Zone Lucknow against O AND M head for the financial year 2025-26.
2025_MVVNL_1056448_1
10/EUDC-VRINDAVAN/LESA/2025-26
Open Tender
Electrical Works
365 days
ALAMBAGH
AS PER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹1,180
A/C NO. 1277784945 IFSC CBIN0280140
₹3,350
8 Oct 2025
11 Jul 2025
26 Aug 2025
11 Jul 2025
25 Aug 2025
11 Jul 2025
Amount
Arresting of leakage and sepage in 10 MVA Power traansformer of 33/11 KV sub station New Alambagh-II, chander nager, Railwey Power House and Sampurnanad. Work Includes Opening of H.T. and L.T Side connection darining out of transormer and radiators, replacement of damage gaskit/cog sheet which will be provided by contractor fotting of Top and radiators with proper tightening of nut and bolts with copper L-Pies and welding proper connection of H.T. & L.T. Side with other assoclated work to complete the job nut bolt and other required material will be provided by contractor.
Centifusing of Transformer Oil upto 70 KV BDV Valve
Supply and errection of silicagel Breather complete for 10 MVA Transformer. All meteral Provided by contractor.
Supply and errection of damage control cable of (4x2.5 Sqmm.) for WTI, OTI and Buchholz upto control pannel. All materal Provided by contractor.
Supply and errection WTI & OTI, All meteral Provided by contractor.
Supply and errection Arching horn. All meteral will be Provided by contractor.
Supply and errection of Coppermess for 11 KV side connection Neutral. All meteral will be Provided by contractor.
Supply and errection of Copper L-Piece (Size 50 mmx10mmx200 mm) for 11 KV side of 10 MVA transformer. All meteral will be Provided by contractor.
GST Extra as per Rules
DEEPAK ENGINEERING (BID ID -5478675)
HARE KRISHNA ENERGY PROJECTS (BID ID -5478500)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid