| 1.00 | Dismantling the damaged Plain Cement concrete flooring work as per the instruction of Departmental officers. Including all initial lead and other labour charges. | 28 | m3 | 487 ₹13,636 | 486 ₹13,608 Lowest |
| 2.00 | Earth work for CC Flooring to required depth, either by cutting and disposal of excavated soil to areas of fill or by filling with earth suitable for filling brought from areas of cutting or borrow pits in all kinds of soils except rock requiring blasting | 28 | m3 | 95 ₹2,660 | 90 ₹2,520 Lowest |
| 3.00 | Conveyance the excess earth or earth not suitable for refilling, dumping and spreading, levelling of the same at places of dump approved by departmental officers and as directed including lorry hire charges, labour for loading, unloading, spreading, leveling, making approaches for areas of dumps etc., complete. | 28 | m3 | 167 ₹4,676 | 166 ₹4,648 Lowest |
| 4.00 | Cement concrete 1:4:8 (one cement, four sand and eight aggregate ) using 40mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 40 | m3 | 5,600 ₹2,24,000 | 5,590 ₹2,23,600 Lowest |
| 5.00 | Supplying and erecting centering for sides and soffits including supports and strutting for plain surfaces such as reinforced cement concrete slabs, walls etc., with all cross bracing etc., including decentering after curing period,complete complying with standard specifications, at all leads inside the building, at all heights. | 50 | m2 | 490 ₹24,500 | 489 ₹24,450 Lowest |
| 6.00 | Supply and fixing of 12mm thick Bituman pad with all labour charges etc complete., | 50 | m2 | 480 ₹24,000 | 479 ₹23,950 Lowest |
| 7.00 | Plain cement concrete 1:2:4 mix (One part of cement, two parts of sand and four aggregates) using 20mm gauge hard stones complying with standard specification. | 30 | m3 | 7,000 ₹2,10,000 | 6,963 ₹2,08,890 Lowest |
| 8.00Add :- GST @ 18% | |||||
Tender Value
₹6 L
EMD Value
₹6,000
Closing Date
10 Jul 2025, 3:00 pmClosed
The Assistant Commissioner, East Zone.
The Assistant Commissioner, East Zone, Coimbatore Corporation, Singanallur, Coimbatore.
Providing CC Flooring at Karattu medu street Ward no. 5, at East Zone.
2025_MAWS_578957_2
E5/EASTZONE/2025
Open Tender
Civil Works - Roads
Works
90 days
Assistant Commissioner, East Zone, Coimbatore Corp
As Per tender condition
4 documents required · 4 mandatory
₹0
₹6,000
2 May 2026
8 Jul 2025
11 Jul 2025
8 Jul 2025
10 Jul 2025
8 Jul 2025
Amount
Dismantling the damaged Plain Cement concrete flooring work as per the instruction of Departmental officers. Including all initial lead and other labour charges.
Earth work for CC Flooring to required depth, either by cutting and disposal of excavated soil to areas of fill or by filling with earth suitable for filling brought from areas of cutting or borrow pits in all kinds of soils except rock requiring blasting
Conveyance the excess earth or earth not suitable for refilling, dumping and spreading, levelling of the same at places of dump approved by departmental officers and as directed including lorry hire charges, labour for loading, unloading, spreading, leveling, making approaches for areas of dumps etc., complete.
Cement concrete 1:4:8 (one cement, four sand and eight aggregate ) using 40mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete.
Supplying and erecting centering for sides and soffits including supports and strutting for plain surfaces such as reinforced cement concrete slabs, walls etc., with all cross bracing etc., including decentering after curing period,complete complying with standard specifications, at all leads inside the building, at all heights.
Supply and fixing of 12mm thick Bituman pad with all labour charges etc complete.,
Plain cement concrete 1:2:4 mix (One part of cement, two parts of sand and four aggregates) using 20mm gauge hard stones complying with standard specification.
Add :- GST @ 18%
DHIYA INFRASTRUCTURE (BID ID -1396726)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
ITB.pdf
Additional Documents • 0.20 MB
BOQ_692053.xls
BOQ • 0.31 MB
EZ-E5-2025-Roads.pdf
Tender Documents • 0.94 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .