| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.0 LAccepted-AOC 37 222 BUNDU KATRA AGRA UP | AGRA | UP | L1 | Accepted-AOC Being lowest | |
| 2 | L2₹45.0 L+₹4.2 L (10.2%)Rejected-Finance A 103 VEERA GARDEN AMBEDKAR NAGAR ALWAR 301001 RAJ | ALWAR | RAJASTHAN | 301001 | L2 | Rejected-Finance Other than lowest | |
| 3 | L3₹48.2 L+₹7.4 L (18.1%)Rejected-Finance | L3 | Rejected-Finance Other than lowest | |
| 4 | L4₹48.6 L+₹7.7 L (19.0%)Rejected-Finance | L4 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | DEMROT ELECTRICAL WORKS L3 | PD GUPTA AND COMPANY L1 | Hitesh Construction L2 | S.R.Enterprises L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Excavating in trenches not exc 1.5 metre wide and not exc 1.5 metre in depth for foundation etc or for laying of cables, pipes etc and getting out in soft/loose soil complete all as specified and directed. | 953.15 | Cum | 200 ₹1,90,630 | 100 ₹95,315 Lowest | 150 ₹1,42,972.5 | 100 ₹95,315 Lowest |
| 2.00 | Returning, filling in, including spreading, leveling, watering and well ramming in layers not exc 25 cm thick in soft/loose soil. | 807.64 | Cum | 70 ₹56,534.8 | 71 ₹57,342.44 | 75 ₹60,573 | 40 ₹32,305.6 Lowest |
| 3.00 | Removal of excavated soil/ material to a distance not exc 50 metre and depositing where directed at a level not exc 1.50 metre above the starting point complete all as specified and directed. | 145.51 | Cum | 80 ₹11,640.8 | 71 ₹10,331.21 | 75 ₹10,913.25 | 40 ₹5,820.4 Lowest |
| 4.00 | Taking up or down GI tubing and connections of 15 mm bore, fixed in walls, ceiling, floors, trenches etc. complete all as specified and directed.
Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of this Schedule. | 300 | RM | 20 ₹6,000 | 5 ₹1,500 Lowest | 25 ₹7,500 | 6 ₹1,800 |
| 5.00 | Taking up or down GI tubing and connections of 20 mm bore, fixed in walls, ceiling, floors, trenches etc. complete all as specified and directed.
Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of this Schedule. | 1,650 | RM | 30 ₹49,500 | 6 ₹9,900 Lowest | 30 ₹49,500 | 7 ₹11,550 |
| 6.00 | Taking up or down GI tubing and connections of 25 mm bore, fixed in walls, ceiling, floors, trenches etc. complete all as specified and directed.
Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of this Schedule. | 400 | RM | 40 ₹16,000 | 7 ₹2,800 Lowest | 40 ₹16,000 | 8 ₹3,200 |
| 7.00 | Taking up or down GI tubing and connections of 50 mm bore, fixed in walls, ceiling, floors, trenches etc. complete all as specified and directed.
Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of this Schedule. | 1,317 | RM | 60 ₹79,020 | 8 ₹10,536 Lowest | 50 ₹65,850 | 15 ₹19,755 |
| 8.00 | Taking up or down GI tubing and connections of 80 mm bore, fixed in walls, ceiling, floors, trenches etc. complete all as specified and directed.
Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of this Schedule. | 800 | RM | 80 ₹64,000 | 9 ₹7,200 Lowest | 60 ₹48,000 | 20 ₹16,000 |
| 9.00 | Taking up or down GI tubing and connections of 100 mm bore, fixed in walls, ceiling, floors, trenches etc. complete all as specified and directed.
Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of this Schedule. | 550 | RM | 100 ₹55,000 | 10 ₹5,500 Lowest | 80 ₹44,000 | 25 ₹13,750 |
| 10.00 | Taking up or down GI tubing and connections of 150 mm bore, fixed in walls, ceiling, floors, trenches etc. complete all as specified and directed.
Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of this Schedule. | 300 | RM | 150 ₹45,000 | 12 ₹3,600 Lowest | 100 ₹30,000 | 30 ₹9,000 |
Tender Value
₹47.4 L
EMD Value
₹95,000
Closing Date
3 Nov 2025, 6:00 pmClosed
GE Alwar
Alwar
SPL REPAIR/REPLACEMENT OF UNSV PIPE LINE INCL CONNECTED ITEMS FOR OFFRS MD ACCN AND ADDN ALTN/MODIFICATION OF BLDG NO P-436/01 TO 05 (SINGLE OFFRS LIVING) AT ITARANA MIL ALWAR
2025_MES_725371_3
8445/E8
Open Tender
Civil Works - Water Works
Item Rate
180 days
Alwar
As per NIT
6 documents required · 6 mandatory
₹500
GE Alwar
₹95,000
Yes
12 Jan 2026
18 Oct 2025
5 Nov 2025
18 Oct 2025
3 Nov 2025
27 Oct 2025
18 Oct 2025 - 25 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
Retender8445-2.pdf
Tender Documents • 0.92 MB
BOQ_824201.xls
BOQ • 6.74 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .