Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-Finance | L1 | Accepted-Finance First Lowest | |
| 2 | L2₹5.1 L+₹10,515 (2.12%)Rejected-Finance | L2 | Rejected-Finance Second Lowest | |
| 3 | L3₹5.1 L+₹17,135 (3.45%)Rejected-Finance | L3 | Rejected-Finance Third Lowest |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
7 Dec 2023, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC
AMAN SAHEED HAMIRPUR
120/SE/EDCH/2023-24
2023_DVVNL_865388_1
120/SE/EDCH/2023-24
Open Tender
Electrical Works
Item Wise
HAMIRPUR
PQC
2 documents required · 2 mandatory
₹1,180
SE EDC
₹5,000
Yes
10 Dec 2023
26 Nov 2023
7 Dec 2023
26 Nov 2023
7 Dec 2023
26 Nov 2023
26 Nov 2023 - 7 Dec 2023
Amount
Cartage of Following Poles From Store Hamirpur or From any other Place to the respective Site of Work Through the Kachha Pacca Road including the work of its loading & unloading at the respective ends, including the cost of Labour T&P carrier etc required for proper completion of work.
(A) 11 M STP Pole
(B) 8.5 M PCC Pole Long
(C) 9 M PCC Pole Long
Cartage of Line Material viz Stone Pad, Top Channel, Dropper Channel, Disc Insulator and other Line Material From ESC/ASK Store Hamirpur or any other place to the respective site of work through the Kachha Pacca Road including the work of its loading & unloading at the respective ends including the work of its dragging etc and also including the cost of Labour T&P and Carrier etc required for proper completion of work.
Erection of Following Single Support of (Any other place) Poles including Complete HT/LT Fitting as per RESSPO Manual and as per direction of Engineer in charge the cost of Labour T&P and Carrier etc required for proper completion of work.
(A) 11 M STP Pole
(B) 8.5 M PCC Pole Long
(C) 9 M PCC Pole Long
Erection of Following Double Pole Support of (Any other Place) Poles including Complete HT/LT Fitting as per RESSPO Manual and as per direction of Engineer in charge the cost of Labour T&P and Carrier etc required for proper completion of work.
(A) 11 M STP Pole
(B) 8.5 M PCC Pole Long
Erection & Grouting of Stay Set including the work of nuzzling etc as per RESSPO Mannual
Dismantling and removal of Existing Weasel Conductor From Various Area Stacking and replacement their coil and their in the respected JE as per direction for proper completion of work.
(A) ACSR Weasel
(B) ACSR Dog
(C) ACSR Racoon
Laying, Sagging, Stringing, Binding and Jumpring etc of ACSR Weasel Conductor New/Old on the Newly erected pole any other place as per RESSPO Mannual and as per direction of Supervising Engineer.
(A) ACSR Weasel
(B) ACSR Dog
(C) ACSR Racoon
(D) ABC 3X120, 1X195, 1X16 mm
Re-Sagging of Loose Conductor as per direction of supervising engineer. Its includes the cost of Labour T&P Carrier etc required for proper completion of work
(A) LT Line
(B) 11 Kv Line
(C) 33 Kv Line
Gaurding of 11 Kv HT Line at road crossing by laying two no GI wire parrallel and fixing of lacing (Tilli) at a distance at 2-3 mtr as per direction of supervising engineer/RESSPO
Three Chooping of 11 Kv Line Near by 11 Kv HT Line & LT Line any other place
Fixing of Earthing rod as per RESSPO manual and as per direction supervising Engineer
Straightening of Tillted Pole at various place as per direction of supervising engineer
(A) 11 M STP Pole
(B) 8.5 M PCC Pole Long
(C) 9 M PCC Pole Long
Replacement of Jumper
(A) LT Line
(B) 11 Kv Line
(C) 33 Kv Line
Dismantling of Following poles by digging pits & dismatling all accesseries from the existing/damage pole including the work of its respective Ends and also including the work of Dragging.
(A) 11 M STP Pole
(B) 8.5 M PCC Pole Long
(C) 9 M PCC Pole Long
Re-Tightening of Stay Complete with nozelling and binding including cost of labour T&P etc require for proper complete work
Fixing of T off Channel with fitting of all accessories as per RESSPO Manual and as per direction of supervising engineer
Replacement of Damage Following accessories
(A) 11 Kv Disc Insulator
(B) 11 Kv Pin Insulator
(C) 11 Kv X Arm
(D) 33 Kv Disc Insulator
(E) 33 Kv Pin Insulator
(F) 33 Kv X Arm
M/S JAGMOHAN SINGH CONTRACTOR
JMC Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .