Loading…
Loading…
Tender Value
₹11.9 Cr
EMD Value
₹23.8 L
Closing Date
31 Jul 2026, 3:00 pm
Design, Supply, Installation, testing & commissioning of 3.0 MW/ 6.0 MWh Battery Energy Storage System at BLW Premises.
EL-1223-W-1200
EL-1223-W-1200
Open
12 Months
Unknown (Unspecified Location)
₹0
₹23.8 L
2 Jul 2026
2 Jul 2026
17 Jul 2026
01-Design, Supply, Installation, testing & commissioning of 3.0 MW/
Design, Drawing, supply, Installation, Testing & Commissioning of online grid connected by-directional Battery Energy Storage System(BESS) including Batteries, Enclosure/Container, PCS, Fire safety, cooling system, Battery Management System (BMS), Energy 1 Management System(EMS) and fire suppression capacity, centralized static and manual bypass and LT distribution board, LT switch gears to connect output with existing main distribution Panel. The Capacity of entire system is not less than 3.0 MW. The cost shall includes all the controller required for synchronized operation of the proper storage battery solution system & step up Inverter duty transformer. The cost shall also include of Design, Drawing, supply, Installation, Testing & Commissioning of Energy Management System.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC_April-2022.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_111_compressed.pdf ACS 11
ATTACHMENT
TenderNo.EL-1223-W-1200.pdf
ATTACHMENT
GCCACS1to8.pdf
ATTACHMENT
GCCCorrectionslip9.pdf
ATTACHMENT
GCCCorrectionslip10.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_111_compressed.pdf
ATTACHMENT
Download all tender documents and submit your bid